
6. Switch on the circuit breaker of all three line conductors.
7. If the multifunction relay is used, switch on any supply voltage to the load.
☑ The start-up phase begins. The start-up phase may take several minutes.
☑ The green LED is glowing and the display alternates between the firmware version, the serial
number or designation of the inverter, the NetID, the IP address, the subnet mask, the
configured country data set and the display language.
✖ The green LED is flashing?
Possible cause of error: the DC input voltage is still too low or the inverter is monitoring the
utility grid.
• Once the DC input voltage is sufficiently high and the grid-connection conditions are met,
the inverter will start operation.
✖ The red LED is glowing and an error message and event number appear in the display?
• Eliminate the error (see Section 4 "Troubleshooting", page 10).
10 Recommissioning the Inverter
SMA Solar Technology AG
Service Manual for Installers
29
STP5-12TL-20-SG-en-13
Содержание SUNNY TRIPOWER 10000TL
Страница 37: ...www renews pro...
Страница 38: ...www SMA Solar com www renews pro...