8

Cleaning the Fans

Procedure:

• Clean the ventilation grids.

• Clean the fans.

Cleaning the Ventilation Grids

Proceed as follows to clean each ventilation grid.

Procedure:

1. Remove the ventilation grid laterally.

2.

Damage to the inverter due to foreign bodies

• Do not remove the ventilation grid permanently, otherwise foreign bodies could penetrate

the enclosure.

3. Clean the ventilation grid with a soft brush, a paint brush, or compressed air.

4. Close the recessed grips with the ventilation grids. Ensure that the assignment is correct. The

correct assignment is marked on the inside of each ventilation grid: 

links/left

 for the left-hand

side and 

rechts/right

 for the right-hand side.

Cleaning the Fans

Proceed as follows to clean each fan.

1.

Danger to life due to high voltages

• Disconnect the inverter from all voltage sources (see Section 2.2, page 7).

2. Wait for the fans to stop rotating.

3. Check whether the fan guard is dusty or badly clogged.

If the fan guard is dusty, clean the fan guard with a vacuum cleaner.
If the fan guard is heavily soiled, remove it and clean it:

• Use a screwdriver to push the two locking

tabs at the right-hand edge of the fan guard
to the right-hand side and remove them
from the retainer.

• Carefully remove the fan guard.

• Clean the fan guard with a soft brush, a paint brush, a cloth or compressed air.

8 Cleaning the Fans

SMA Solar Technology AG

Service Manual for Installers

25

STP5-12TL-20-SG-en-13

www.renews.pro

Содержание SUNNY TRIPOWER 10000TL

Страница 1: ...Service Manual for Installers SUNNY TRIPOWER 5000TL 6000TL 7000TL 8000TL 9000TL 10000TL 12000TL STP5 12TL 20 SG en 13 Version 1 3 ENGLISH www renews pro...

Страница 2: ...ied as such Missing designations do not mean that a product or brand is not a registered trademark Modbus is a registered trademark of Schneider Electric and is licensed by the Modbus Organization Inc...

Страница 3: ...1 LED Signals 10 4 2 Event Messages 10 4 3 Error Messages 11 5 Checking the PV System for Ground Faults 18 6 Checking the Function of the Varistors 22 7 Replacing the Varistors 24 8 Cleaning the Fans...

Страница 4: ...qualified persons Qualified persons must have the following skills Knowledge of how an inverter works and is operated Training in how to deal with the dangers and risks associated with installing and...

Страница 5: ...ific goal Desired result A problem that might occur 1 4 Nomenclature Complete designation Designation in this document Sunny Tripower Inverter product Electronic Solar Switch ESS SMA BLUETOOTH Wireles...

Страница 6: ...lated cable ends Do not touch the DC conductors Do not touch any live components of the inverter Have the inverter mounted installed and commissioned only by qualified persons with the appropriate ski...

Страница 7: ...m Voltage Sources Prior to performing any work on the inverter always disconnect it from all voltage sources as described in this section Always adhere to the prescribed sequence Destruction of the me...

Страница 8: ...obe into each round opening of the terminal 10 Use an appropriate measuring device to ensure that no voltage is present at the AC connecting terminal plate between L1 and PE L2 and PE and L3 and PE In...

Страница 9: ...of cleaning agents If the inverter is dirty clean the enclosure the enclosure lid the type label the display and the LEDs with a damp cloth and clear water only 3 Cleaning the Inverter SMA Solar Tech...

Страница 10: ...activated 4 2 Event Messages Display message Cause Update file OK The update file found is valid Grid parameter locked The parameters are locked and you cannot change them Update communication The inv...

Страница 11: ...203 Grid fault The utility grid has been disconnected the AC cable is damaged or the grid voltage at the connection point of the inverter is too low The inverter has dis connected from the utility gr...

Страница 12: ...tion The inverter has stopped feeding into the utility grid Corrective measures Check the grid connection for significant short term frequency fluctuations 501 Grid fault The power frequency is not wi...

Страница 13: ...nsure that the AC connection is correct see operating manual of the inverter Ensure that there is no potential difference between N and the grounding conductor in the building installation Ensure that...

Страница 14: ...the PV system for ground faults see Section 5 page 18 3601 High discharge curr Check generator The leakage current from the inverter and the PV array is too high There is a ground fault a residual cu...

Страница 15: ...Overtemperature The inverter has switched off due to excessive temperature Corrective measures Clean the fans see Section 8 page 25 Ensure that the inverter has sufficient ventilation 6511 Overtemper...

Страница 16: ...equently clean the fans see Section 8 page 25 Ensure that the inverter has sufficient ventilation 8101 to 8104 Comm disturbed The cause must be determined by the Service Corrective measures Contact th...

Страница 17: ...l protected and cannot be changed Corrective measures Enter the correct Grid Guard code 9003 Grid parameter locked The parameters are now locked You cannot change the parameters Corrective measures Un...

Страница 18: ...or ground faults by measuring the voltage If the voltage measurement was not successful check the PV system via insulation resistance measurement for ground faults Test by Measuring the Voltage Procee...

Страница 19: ...s still displayed measure the insulation resistance 4 Reconnect the strings without ground faults to the inverter and recommission the inverter Test by Measuring the Insulation Resistance If the volta...

Страница 20: ...and short circuiting of the PV array If no suitable device is available the insulation measurement must not be carried out Procedure 1 Calculate the expected insulation resistance per string 2 Danger...

Страница 21: ...on error contact the Service see Section 13 Contact page 34 The PV modules might not be suitable for the inverter in the present quantity 5 Checking the PV System for Ground Faults SMA Solar Technolog...

Страница 22: ...tected against overvoltage Do not operate the inverter without varistors in PV systems with a high risk of overvoltages Do not recommission the inverter until the defective varistors have been replace...

Страница 23: ...nection the varistor is defective SMA Solar Technology AG recommends replacing all varistors immediately Order new varistors and insertion tools see Section 12 Spare Parts page 33 Reinsert old varisto...

Страница 24: ...connecting terminal plate 3 Remove the varistor from the connecting terminal plate 4 Insert the new varistor into the connecting terminal plate The label of the varistor must face to the right in the...

Страница 25: ...the left hand side and rechts right for the right hand side Cleaning the Fans Proceed as follows to clean each fan 1 Danger to life due to high voltages Disconnect the inverter from all voltage source...

Страница 26: ...fan plug 5 Damage to the fan due to compressed air Clean the fan with a soft brush a paint brush or a damp cloth 6 Insert the plug of the fan in the pin connector until it snaps into place 7 Insert t...

Страница 27: ...bottom and is coming out of the upper ventilation grids and whether the fans are making any unusual noises If no air is being drawn in through the bottom no air is coming out of the ventilation grids...

Страница 28: ...screw head Position the enclosure lid with the six screws on the enclosure and tighten all six screws in the sequence 1 to 6 using an Allen key AF 5 torque 6 Nm 0 5 Nm The teeth of the conical spring...

Страница 29: ...he configured country data set and the display language The green LED is flashing Possible cause of error the DC input voltage is still too low or the inverter is monitoring the utility grid Once the...

Страница 30: ...tage sources see Section 2 2 page 7 2 Remove the AC cable from the inverter Press the locking levers all the way upward and pull the conductors out of the connecting terminal plate for the AC cable 3...

Страница 31: ...n the cylindrical screw M6x16 and remove the screw conical spring washer clamping bracket and grounding conductor 8 Remove the ventilation grids laterally 9 Loosen the screws on both sides between the...

Страница 32: ...vel support surface or lay it on its back 13 If the inverter is to be stored or shipped in a package pack the inverter the protective cover and the ESS Use the original packaging or packaging that is...

Страница 33: ...thermally moni tored varistors incl insertion tool STP TV10 Insertion tool for replacing varistors Insertion tool for varistors SB TVWZ Ventilation grid Ventilation grid set right and left as spare p...

Страница 34: ...r Technology AG Niestetal Sunny Boy Sunny Mini Central Sunny Tripower 49 561 9522 1499 Monitoring Systems Kommunikationsprodukte 49 561 9522 2499 Fuel Save Controller PV Diesel Hybridsysteme 49 561 95...

Страница 35: ...w SMA Service com Italia SMA Italia S r l Milano 39 02 8934 7299 SMA Online Service Center www SMA Service com Bulgaria Rom nia Slovenija Hrvatska SMA Service Partner Renovatio Solar 40 372 756 599 SM...

Страница 36: ...l Chile Per SMA South America SPA Santiago de Chile 562 2820 2101 Australia SMA Australia Pty Ltd Sydney Toll free for Australia 1800 SMA AUS 1800 762 287 International 61 2 9491 4200 Other countries...

Страница 37: ...www renews pro...

Страница 38: ...www SMA Solar com www renews pro...

Отзывы: