6 Commissioning
SMA Solar Technology AG
System Manual
SPBusiness-SH-en-10
23
Consumption Limit
dP
D
D
D
D
C
C
C
C
C
C
Discharge Setpoint = 30
Charge Setpoint = 10
Purchased
Electricity
Grid
Feed-In
Time
C
C
D
D
dP
Charge
Discharge
Load peak
Figure 5: Battery is charged from local generation
Feed-In Limit
dP
D
D
D
D
C
C
C
C
C
C
Discharge Setpoint = 60
Charge Setpoint = −40
Purchased
Electricity
Grid
Feed-In
Time
C
C
D
D
dP
Charge
Discharge
Load peak
Figure 6: Battery is charged from the utility grid
Procedure:
1. Select the menu
Setup
.
2. In the menu
Power Management
enable the function
Peak Load Shaving
. Otherwise, the
Time of Use
function could be used.
3. Under
Peak Load Shaving
enter the value for
Consumption Limit
and
Feed in Limit
under
Peak Load Shaving
.