2. Connect the LAN1 of the Inverter Manager to network switch 1 using a network cable
3. Connect the LAN2 of the Inverter Manager to network switch 2 using a network cable
5.5
Installing the Janitza UMB 604-PRO
1. Install the Janitza UMG 604-PRO in the distribution board in front of the point of
interconnection.
2. Connect the voltage supply.
3. Connect suitable voltage converters and current transformers if needed. The current and
voltage converters must be provided on site.
4. Connect the Janitza UMG 604-PRO to network switch 1 using a network cable.
5.6
Installing the SMA Energy Meter
1. Install the SMA Energy Meter in the distribution board in the electric circuit that is to be
captured by the SMA Data Manager as the customer-specific measuring point. In a single-
phase electric circuit, connect the line conductor L1 and the neutral conductor.
2. Connect the SMA Energy Meter to network switch 1 using a network cable.
☑ The LEDs of the Energy Meter glow during start-up. The Energy Meter automatically connects
to the SMA Data Manager.
5.7
Installing the SMA Data Manager
1. Mount the SMA Data Manager in the distribution board and connect the voltage supply.
2. Connect digital signal source (e.g. ripple control receiver) if necessary.
☑ The start-up process begins. The SMA Data Manager is in operation when the system LED
glows green.
3. Connect the SMA Data Manager to network switch 1 using a network cable.
5.8
Installing the Battery
1. Mount the battery cabinet.
2. If available, mount the extension kit for the battery-storage system (Storage Extension Kit
TV-10).
3. Install all necessary parts and connect with each other inside the cabinet.
4. If available, mount the Battery Storage Combiner TV-10 and connect.
5. Route the DC cables from the battery cabinet to the Sunny Tripower Storage, but do not
connect them to the battery yet. The DC cables must first be connected to the
Sunny Tripower Storage and only then to the battery.
6. Connect the battery management system to network switch 2 using a network cable.
5.9
Installing the Battery Inverter
1. Mount the Sunny Tripower Storage and make the electrical connections.
2. Connect the Sunny Tripower Storage to network switch 2 using a network cable.