6 Electrical Connection
SMA Solar Technology AG
20
GRID-BOX-12-3-20-BE-en-11
Operating Manual
Cable requirements:
Conductor material: copper
Conductor cross-section: 1.5 mm² to 2.5 mm²
The AC conductors and DC conductors must always be routed in separate cables.
Procedure:
1. Insert the control cables into the Grid-Connect-Box (see Section 9.3, page 25).
2. Connect the control cables to the spring-cage terminals (see Section 9.4.2, page 27).
•
X310:1,2
: Multicluster-Box grounding contactor interlock
•
X310:4,5
: Grid-Connect-Box grid contactor feedback
•
X311:1
-
4
: Grid-Connect-Box voltage measurement
•
X311:6,7
: Multicluster-Box generator contactor interlock
•
X311:8,9
: Grid-Connect-Box AC contactor interlock
3. Ensure that the insulated conductors are firmly in place.
6.6 Mounting the Kick Plates
Requirement:
All installation work must be completed.
Procedure:
1. Ensure that the power cables are secured with a strain relief.
2. Insert the kick plates and attach using the fastening screws (TX 30, torque: 12 Nm).
Ground connection at terminals X310 and X311
If the control cable between the Multicluster-Box and Grid-Connect-Box contains a grounding conductor, the
grounding conductor terminal must not be connected on both sides.
Содержание GRID-CONNECT-BOX 12
Страница 1: ...GRID BOX 12 3 20 BE en 11 Version 1 1 ENGLISH Operating Manual GRID CONNECT BOX 12...
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ...www SMA Solar com SMA Solar Technology...