![Sloan ESD-200 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/sloan/esd-200/esd-200_installation-instructions-manual_1293640004.webp)
1 - Install Spout
2 - Attach Motor Assembly
A
Slide Rubber Gasket onto Brass Shank making certain that
hole in Gasket is positioned over Spring Pin in Base of Spout
(where applicable).
3 - Attach Battery Pack (Models ESD-250 & ESD-350 Only)
A
Slide C-clip to open position.
D
Guide Sensor Cord through Flange Nut. Screw Flange Nut onto
Brass Shank and tighten.
C
Position Spout to direct soap into sink.
B
Guide Brass Shank and Sensor Cord through hole in counter.
RUBBER
GASKET
BRASS
SHANK
FLANGE NUT
SENSOR CORD
MOTOR
ASSEMBLY
C-CLIP
B
Place motor assembly at
bottom of shank.
C
Rotate motor
housing to avoid
lavatory bottom and
existing plumbing.
Position motor
housing so red reset
button is accessible.
D
Push the motor assembly up into place and secure by pushing the
C-clip closed.
E
Plug sensor connector into motor assembly and slide rubber seal
into place.
SENSOR
CORD
MOTOR
ASSEMBLY
C-CLIP
BATTERY PACK
(CUTAWAY VIEW)
BATTERY PACK CORD
A
Place battery pack in a convenient
location ensuring easy access.
B
Secure to wall with screws and anchors.
Note: The battery pack may be
mounted using one screw and anchor
with the top slot facilitating easy
removal for battery replacement. A
foam gasket is applied to the back to
seal screw holes.
C
Install 4 alkaline D-size batteries.
D
Connect the power cord
from the battery pack by
inserting then screwing
clockwise into inlet on
top of motor assembly.
4
RESET
BUTTON
RESET
BUTTON
E
Wall clip set may be
used to hold the power
cord against the wall.
SENSOR
CONNECTOR
MOTOR
ASSEMBLY
CORD