MG_0062

Technical Wiring Diagram

A1

A2

D2

NTC

Thruster motor

D1

1

2

3

4

5

6

7

8

To PPC

B+

To PPC

M-

Multi cable to PPC

grey

blue

white

red

pink

(Opt.)

8-Way connector

C

C

red or  

 red-brown

MC_0120

S-Link System Description

S-Link is a CAN-based control system used for communication between Sleipner products installed on a vessel. The system uses BACKBONE Cables 

as a common power and communication bus with separate SPUR Cables to each connected unit. Units with low power consumption are powered 

directly from the S-Link bus therefore one power cable must be connected to the BACKBONE Cable through a T-Connector. The S-Link cables should 

be installed such that sharp bend radius is avoided. Locking mechanism of connectors must be fully closed. Cables, T-Connectors and Extenders 

should not be located such that they are permanently immersed in water or other fluids. 

 

Main advantages of S-Link system:

-    Compact and waterproof plugs.

-    BACKBONE and SPUR Cables have different colour coding and keying to ensure correct and easy installation. BACKBONE Cables have blue  

  connectors and SPUR Cables have green connectors.

-    Different cable lengths and BACKBONE Extenders makes the system scalable and flexible to install. 

Installation of S-Link cables:

Select appropriate cables to keep the length of BACKBONE- and SPUR Cables to a minimum. 

The S-Link cables should be installed to ensure sharp bend radius’s is avoided. The locking mechanism on connectors must be fully closed. Cables, 

T-Connectors and Extenders should not be located so that they are permanently immersed in water or other fluids. 

The POWER Cable should ideally be connected around the middle of the BACKBONE Cable to ensure an equal voltage drop at each end of the 

BACKBONE Cable. The yellow and black wire in the POWER Cable shall be connected to GND and the red wire connected to +12VDC or +24VDC.

To reduce the risk of interference, avoid routing the S-Link cables close to equipment such as radio transmitters, antennas or high voltage cables. The 

backbone must be terminated at each end with the END Terminator.

Spur cables can be left unterminated to prepare for the installation of future additional equipment. In such cases, ensure to protect open connectors 

from water and moisture to avoid corrosion in the connectors.

MG_0159

BACKBONE Cable

Forms the communication and power bus throughout 

a vessel. Available in different standard lengths.

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Green ends

*Green ends

*Green ends

*Green ends

*Green ends

SPUR Cable

Used to connect S-Link compliant products to the 

backbone cable. One SPUR Cable must be used for 

each connected component, with no exceptions. 

Recommended to be as short as practically possible. 

Available in different standard lengths.

POWER Cable

Must be one in each system. Connects BACKBONE Cable 

to the power supply. 

4-Port T-Connector

The 4-PORT T-connector allows multiple SPUR Cables to be 

connected. The 4-PORT T-connector comes with two sealing 

caps to protect unused ports.

T-Connector

Used for connection of SPUR 

or POWER Cable to the 

BACKBONE Cable. One 

T-Connector for each 

connected cable.

BACKBONE Extender

Connects two BACKBONE 

Cables to extend the length. 

END Terminator

Must be one at each end of 

the BACKBONE bus. 

+12/24V

GND

Optional ON/OFF Switch

 Fuse 2A

S-Link installation example

Spur

Power

T-Connector

End 

Terminator

End 

Terminator

Backbone Extender

Bow Thruster

Control Panel

Backbone

Backbone

Backbone

Spur

Spur

4 Port T-Connector

4 Port T-Connector

Stern Thruster

Automatic 

Main switch

S-Link

Power Supply

yellow

red

black

Содержание SEP60

Страница 1: ...SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Pro DC Electric Thruster Models SEP60 EN I M 2721 15 2021...

Страница 2: ...tions 6 Positioning of the tunnel thruster 7 Tunnel Length 8 Tunnel installation in sail boats 9 Water Deflection 10 Tunnel ends 11 Tunnel installation 12 13 Stern tunnel installation 14 Gear Leg Moto...

Страница 3: ...to ensure necessary familiarity with the product before installation Instructions in this document cannot be guaranteed to comply with all international and national regulations It is the responsibil...

Страница 4: ...ducts In case of connecting third party equipment it must always be connected through a Sleipner supplied interface product Any attempt to directly control or connect into the S Link control system wi...

Страница 5: ...ater Depth 185 7 3 185 7 28 TL Minimum tunnel length 128 5 128 5 04 TL recommended Recommended tunnel length 165 6 5 165 6 50 T min Minimum tunnel wall thickness 4 0 16 4 0 16 T max Maximum tunnel wal...

Страница 6: ...s thread inserts Tunnel Cross spun with rowing G R P tunnel Steel aluminium tunnels available at request Propeller 5 blade skewback Q prop propeller breglass reinforced composite Batteries Minimum rec...

Страница 7: ...ep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during operat...

Страница 8: ...the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereby the th...

Страница 9: ...he tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster in the...

Страница 10: ...ngled slightly down because of the water flow on this area 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler will pu...

Страница 11: ...nd thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angled tunn...

Страница 12: ...e back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass to the a...

Страница 13: ...nstalled and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible round t...

Страница 14: ...tion please refer to the supplied manual in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Ins...

Страница 15: ...with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and propeller...

Страница 16: ...propeller until the drive pin aligns with the internal slot in the propeller 2 Insert the washer to the end of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of th...

Страница 17: ...the bolts holding the motor to the motor bracket with the above torque 5 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can be hard due to the gear reduction...

Страница 18: ...ical operation of the vessel when not on board or in emergencies NB It is advised to install a fuse on the positive cable for protection against short circuiting of the main cables The fuse should ens...

Страница 19: ...AWG 2 0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0 2 x 3...

Страница 20: ...2721 15 2021 SEP60 MG_0062 Technical Wiring Diagram A1 A2 D2 NTC Thruster motor D1 1 2 3 4 5 6 7 8 To PPC B To PPC M Multi cable to PPC grey blue white red pink Opt 8 Way connector C C red or red bro...

Страница 21: ...ll be connected to GND and the red wire connected to 12VDC or 24VDC To reduce the risk of interference avoid routing the S Link cables close to equipment such as radio transmitters antennas or high vo...

Страница 22: ...ack red B B 05M 05M 5A 12 24 5A 12 24 PPC PJC 212 Proportional joystick control panel Bow and stern Station 1 S PJC 212 Observe PPC battery terminal polarity S S 12 24V 5A S link on off switch red yel...

Страница 23: ...For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISIO...

Страница 24: ...use and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightened wel...

Страница 25: ...to the Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding that...

Страница 26: ...26 2721 15 2021 SEP60 MC_0037 Notes...

Страница 27: ...27 2721 15 2021 SEP60 MC_0037 Notes...

Страница 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Motor AS can not accept liability for any possible differen...

Отзывы: