![Sleipner SEP210 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/sleipner/sep210/sep210_installation-manual_1292924002.webp)
2
2713
18
2021
-
SEP 210
DECLARATION OF CONFORMITY
Sleipner Motor AS
P.O. Box 519, Arne Svendsensgt. 6-8
N-1612 Fredrikstad, Norway
Declare that this product with accompanying standard control systems complies with the
essential health and safety requirements according to:
DIRECTIVE 2013/53/EU
DIRECTIVE 2014/30/EU
DIRECTIVE 2014/35/EU
MC_0020
Bow Installation Instructions
Bow Installation Considerations and Precautions ..................... 3
Thruster Measurements .......................................................... 4
Thruster Specifications
.............................................................. 5
Technical Specifications
.......................................................... 5
Positioning of the tunnel / thruster ............................................. 6
Tunnel Length ............................................................................ 7
Tunnel installation in sailboats ................................................... 8
Water Deflection
........................................................................ 9
Tunnel ends ............................................................................. 10
Tunnel installation ............................................................. 11 - 12
Stern tunnel installation ........................................................... 13
Thruster Installation Instructions
Thruster Installation Considerations and Precautions ............. 14
Gear Leg & Motor Bracket Installation..................................... 15
Propeller Installation ................................................................ 16
Motor Installation ..................................................................... 17
Thruster Electrical Installation ................................................. 18
Electrical Specifications
.......................................................... 19
Control Panel Cable Installation ............................................. 20
S-link Planning & Precautions ................................................ 21
Technical Wiring Diagram ....................................................... 22
Control Panel Installation ........................................................ 23
Pre-delivery Checklist ........................................................... 24
Service and Support ...................................................... 25
Product Spare Parts and Additional Resources ............... 25
Warranty statement ...................................................... 25
Contents
EN
MC_0031
Bow Installation Considerations and Precautions
EN
• The thruster must NOT be installed in compartments that require ignition proof electric equipment. If necessary, make a separate compartment.
(NB: Ignition Protected systems are tested to be installed in areas with possible explosive gases in accordance with ISO 8846)
• The electro motor will generate some carbon dust so any storage compartments must be separated from the thruster to prevent nearby items
becoming dusty/ dirty.
(NB: IP version motors generate dust but are enclosed.)
• When installing the thruster electro motor in small compartments, ensure the compartment is well ventilated to allow for cooling of the electro
motor.
• If the height of the room you are installing the thruster is limited, the thruster can be installed horizontally or at any angle in-between.
- If the electro motor is positioned more than 30 degrees off vertical, it must be supported separately.
- Beware of keeping installation within advised measurements. No part of the propeller or gear house must be outside the tunnel.
• Do not install the thruster in a position where you need to cut a stiffener/ stringer/ support that may jeopardise the hull integrity without checking
with the boat builder this can be done safely.
• The electro motor, components and cables must be mounted so they remain dry at all times.
• We advise painting the gear house and propellers with anti-fouling.
(NB: Do not paint the anodes, sealing, rubber fi ttings or propeller shafts)
• Do not fi nish the inside of the tunnel with a layer of gel-coat/ topcoat or similar. There is only room for a thin coat of primer and two layers of anti-
fouling between the tunnel and the props.
• Don’t install the electro motor close to easily flammable objects or equipment as it will reach over 100°C before the temperature switch is activated.
• Do not store items close to the thruster motor. Any loose items near the thruster motor is a potential fi re hazard and can cause undesired short-
circuiting.
MC_0257
Thruster Installation Considerations and Precautions
EN
Before installation, it is important that the installer reads this guide to ensure necessary acquaintance with this product.
• The electro motor must be handled with care. Do not lift it by internal cable connections, main terminals or placed down on the drive shaft.
• The thruster power supply circuit must include the recommended sized fuse and a battery isolation switch.
• Never run the thruster out of water.
• It is important to follow the guidelines in this manual. Failure can result in severe damage to the thruster.
Products
SEP210/250TC - SEP210 Tunnel thruster, 24V
Содержание SEP210
Страница 22: ...22 2713 18 2021 SEP 210 MG_0062 Technical Wiring Diagram EN...
Страница 26: ...26 2713 18 2021 SEP 210 MC_0037 Notes EN...
Страница 27: ...27 2713 18 2021 SEP 210 MC_0037 Notes EN...