
19
4354
13
2022
-
SEP IP 60
MG_0560
PPC
Proportional Power
Controller (PPC)
IP Thruster
8-lead cable
M-
B+
S-Link Spur cable
S-Link Spur cable
S-Link Backbone cable
Refer to the User and Installation Manual of the control panel
to be installed for detailed installation instructions.
See S-Link System Description chapter for detailed
information on installation of S-Link Power cable and
additional S-Link components.
Selection of battery, fuse, main switch and cable cross section is described in
Electrical Installation
chapter.
Wiring Diagram
B+
B-
++
Thruster
Battery
*Automatic Main Switch
Fuse 5A
Control
panel
ANL Fuse
*Automatic Main Switch can be replaced with a manual main switch or fuse.