![SLEIPNER MOTOR AS SXP35POD Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/sleipner-motor-as/sxp35pod/sxp35pod_installation-manual_1292982015.webp)
15
6399
12
2022
-
HydroPOD 35 & 50
MG_0530
Control box
installation
location
SX thruster
hose
Max 0.75m
1
2
3
Hose claps
Control Box Installation
4. Follow the cable marking and fasten motor power cables coming from the SX Thruster in the control box. The motor power cables are marked
A1 and A2 and should be fastened to the terminal with corresponding marking. Place the ring cable lug connected to the white wire between the
lug of the motor power cable and the nut. Fasten the nut with recommended torque. Ensure that the ring cable lug is kept at same terminal as
originally placed.
- Insert the B+ and M- power cables into the grommet or external connectors as shown in fi gure below. Fasten the power cables to the terminals
with recommended torque.
- Connect the Temp Switch and NTC connector
5. Tighten hose clamp on Control Box.
6. Fasten the control box to the hull.
MC_0075
IMPORTANT
It is the installers full responsibility to follow instructions and ensure total Ignition Protection.
MG_0531
Control Box
hose clamp
4
6
5
SXP
50
CONTROL BOX
B / - cable
B / - cable
SX/P 35 does not come with
a control box cover
A1 / A2 cable
Tighten to
3.6 - 3.9 NM
2.7 - 2.9 ft/lb
B-
B+
A1
A2
Temp
switch NC
NTC
Tighten to
3.6 - 3.9 NM
2.7 - 2.9 ft/lb
Tighten to
3.6 - 3.9 NM
2.7 - 2.9 ft/lb
NTC
Temp
switch NC
SXP
35
CONTROL BOX
A1
A2
Содержание SXP35POD
Страница 22: ...22 6399 12 2022 HydroPOD 35 50 MC_0037 Notes...
Страница 23: ...23 6399 12 2022 HydroPOD 35 50 MC_0037 Notes...