SLEIPNER MOTOR AS SIDE-POWER 86-08955 Скачать руководство пользователя страница 2

Control Panel 86-08955

  

version 1.0 - 2014

2

Content/Innhold

Product Features/Produkt oversikt ..................................................................... 3

Installation  ............................................................................................................ 4

Installasjon  ........................................................................................................... 5

Wiring diagram/Koblingsskjema ....................................................................6-7

Important ! 

These panels will only work with Sidepower electric windlass with a built in electronic

control box and a 4/5 lead control cable system. These panels are waterproof from the 

front end when correctly installed. However, you must ensure that they can never be 

submerged in water as this might cause a shortcircuit and thereby causing the thruster to 

start unintededly.

Viktig ! 

Disse kontroll panel fungerer bare med Sidepower elektriske vinsjer med integrert

elektronisk kontroll boks og 4/5 leders kontroll kabel system. Disse panelene er vantette

fra fronten når de er korrekt installert. Men, de må aldri stå slik att de er under vann da 

dette kan gi en kortslutning som kan føre til selvstarting av trusteren.

DECLARATION OF CONFORMITY

We, 

 

Sleipner Motor AS

 

  P.O. Box 519

 

  N-1612 Fredrikstad, Norway

declare that this product with accompanying standard remote 

control systems complies with the essential health and safety 

requirements according to the Directive 89/336/EEC of 23 

May 1989 amended by 92/31/EEC and

93/68/EEC.

Содержание SIDE-POWER 86-08955

Страница 1: ... N 1612 Fredrikstad Norway Tel 47 69 30 00 60 Fax 47 69 30 00 70 w w w s i d e p o w e r c o m sidepower sleipner no K e e p t h i s m a n u a l o n b o a r d 86 08955 Windlass Control Panel v1 0 SIDE POWER Windlass Systems Installation manual EN Installasjon manual NO ...

Страница 2: ... causing the thruster to start unintededly Viktig Disse kontroll panel fungerer bare med Sidepower elektriske vinsjer med integrert elektronisk kontroll boks og 4 5 leders kontroll kabel system Disse panelene er vantette fra fronten når de er korrekt installert Men de må aldri stå slik att de er under vann da dette kan gi en kortslutning som kan føre til selvstarting av trusteren DECLARATION OF CO...

Страница 3: ...anel 86 08955 version 1 0 2014 3 Product features Produkt oversikt Ref Pcs Parts 1 1 x Control panel Kontrollpanel 2 1 x Gasket Pakning 3 4 x Screws A4 Skruer 4 4 x Front ring Frontring 1 2 3 4 UP DOWN ON 2 OFF ...

Страница 4: ...pped use a sealant to assist the gasket A Put the gasket 2 in its designated track in the back face of the panel 1 B Connect the contact with the control cable from the windlass C Connect the control output to the Sidepower automatic main switch if installed D Put the panel 1 in place and screw in and tighten the four screws 3 E Gently twist on the decor front ring 4 clockwise NB If the windlass r...

Страница 5: ...en må det benyttes en tetningsmasse sammen med pakningen for å sikre god tetning A Sett inn pakingen 2 i sporet på baksiden av panelet 1 B Koble kontakten sammen med kontroll kabelen fra vinsjen C Koble kontroll signalet til Sidepower automatisk hovedstrømsbryter der som installert D Sett panelet 1 inn og skru inn de fire skruene 3 E Vri på den medleverte frontringen 4 medurs NB Dersom vinsjen sku...

Страница 6: ...Control Panel 86 08955 version 1 0 2014 6 Wiring diagram Koblingsskjema ...

Страница 7: ...Control Panel 86 08955 version 1 0 2014 7 Wiring diagram Koblingsskjema ...

Страница 8: ...Worldwide sales and service www side power com SLEIPNER MOTOR AS P O Box 519 N 1612 Fredrikstad Norway Tel 47 69 30 00 60 Fax 47 69 30 00 70 www side power com sidepower sleipner no ...

Отзывы: