Manual_MSM_2021-10-013.00_EN.docx
7
6. UNPACKING AND INSTALLATION
6.1 UNPACKING THE INSTRUMENT
Remove the upper wooden cover.
Remove the upper supporting foams.
Lift the instrument out of the wooden transportation case.
i
Lift the instrument according to the photo
only at the platform of the cuvettes
or at the bottom of the instrument – never at the black turn table or at the
arms.
For repacking use the original cases. Keep the packing material.
Place the instrument onto the selected bench.
6.2 INSTALLATION
The unit should be positioned onto a plane level surface.
Leave enough space around the machine to place cuvettes or reagents for preparation.
Leave enough space at the back of the instrument for optional connection of exhaust air
system.