
ENGLISH
21
III. TAKING DOWN THE SLACKLINE
• Note for the 25/35/45 m SlackTivity Kits and 18 m
Soft ’n Slack Kits: First of all make sure to
remove the second Express-Ring and the
pulling-aid (only 35/45 m SlackTivity Kits) from
the line.
• To relieve the pulley hold tight to the remaining
line and walk towards the middle of the
Slackline; pull till the first locking mechanism
comes off.
• Use the same method when you continue
to release the second locking at fixed-point 2.
• The line can now easily be threaded back.
Fig. 10