20
If the Enclosure net and Jumping mat are pre-installed,
follow
the
below steps to assemble the Jumping mat to frame.
.
6.1 Inspect the connection of Jumping mat and Enclosure
net, make sure all the V-rings are passed through the
corresponding net holes.
6.2 Place the Jumping mat(7) on clear ground inside the
frame, and then adjust the location to make sure the
first V-ring aligns with the middle tube as shown.
The first V-ring refers to the one that has a clip on it.
6.3 Attach the first V-ring with a spring to the fourth spring
hole (count from left side) on the middle tube(2).
6.
6
Enclosure door
first V-ring middle tube
the fourth hole
Clip
Enclosure door
V-ring
Frame
7
10
41
Attach the Spring as follows:
Hook one end of Spring into the V-ring sewn on Jumping mat.
Hook a Spring Tool(41) as shown to the free end of the Spring.
Pull the Spring until it reaches the frame.
It is wise to wear leather gloves while attaching the springs.
Be careful where you place your hands as the Springs and
Frame joints can pinch.
A:
B:
C:
Push the end of the Spring into the hole in the frame, then
unhook the spring tool.
D:
CAUTION: