
8
2.1.2 Electrical Installation
Before plugging the equipment on the socket, make sure the network voltage is the same
as indicated on the cord label.
The power plug has 3 (three) pins, the middle one is designed to grounding – Ground Pin.
All the 3 (three) pins must be properly connected before operating the equipment.
2.2 Pre Operation
Before using the Centrifuge Juicer, the parts that will be in contact with the product that
will be processed shall be washed with water.
IMPORTANT
Make sure the network voltage where the equipment is going to be installed is the
same as indicated on the cord label.
Assembly Sequence
01
02
03
04
05
01 - Pusher
02 - Liquid Chamber Lid
03 - Sieve
04 - Liquid Chamber
05 - Motor Support Flange
Содержание CSE
Страница 1: ...INSTRUCTIONS MANUAL CENTRIFUGE JUICER CENTR FUGA DE JUGOS MODEL MODELO CSE...
Страница 20: ...20 7 Electric Diagram ELECTRIC NETWORK 110V 60Hz ON OFF SWITCH ELECTRONIC BOARD...
Страница 21: ...21 ELECTRIC NETWORK 220V 60Hz ELECTRONIC BOARD ON OFF SWITCH...
Страница 40: ...40 7 Diagrama El trico ELECTRIC NETWORK 110V 60Hz ON OFF SWITCH ELECTRONIC BOARD...
Страница 41: ...41 ELECTRIC NETWORK 220V 60Hz ON OFF SWITCH ELECTRONIC BOARD...