Equipment installation is a personal venture. There is one golden rule: Do it as neat
and logical as possible! This will make fault finding and service of components eas-
ier. The Hawk basically consist of 6 circuits!
1. Servo wires
2. Power cables
3. Data cables
4. Pneumatic pipes
5. Fuel pipes
6. RX cable / Satellite Receivers
Please try and separate these circuits as far as possible. It is advisable not to run RX
cables near any kind of electrical fields. Make all switches and filler valves and charg-
ing sockets easy accessible.
The Hawk will come out tail heavy if you do not plan installation. It is very important
to install all equipment as far forward as possible.
I have installed 2 x RX + 2 X ECU batteries in front of nose gear. This is weight of
1.2 kg together.
I have installed a UAT in front of main tank. This will always be full of fuel and will
help with the final adjustment of CG.
The accessory tray must be mounted as low as possible to accommodate cockpit