01/11/2017
15/36
E_MH_Mounting_instructions_Skylux_Climalux
Gutter GX
Assemble the gutter components to prepare for the installation of the gutter
Cut out the opening for the water outlet.
Use a Ø 80 mm circular drill (not supplied).
Slide in the reinforcement profile V822 (optional).
Installation of the U-bracket PU
Use the post caliber for the correct positioning.
* The reinforcement profile V822 is not supplied. It can be bought at any local hardware store.
We recommend treating the reinforcement profiles with an anti-corrosion product.
Ø 80
55
86
GX
GX
V822
4
2
2
4
55
86
PU
ZSB (3x)