background image

SECTION 1 INTRODUCTION

PURPOSE OF EQUIPMENT ................................................................................................................................   1

USE OF EQUIPMENT ...........................................................................................................................................   1

WARNINGS ...........................................................................................................................................................   1

DESCRIPTION ......................................................................................................................................................   1

SPECIFICATIONS AND FEATURES .....................................................................................................................   3

WORK PLATFORM MAJOR COMPONENT IDENTIFICATION (SJKB-33N) ........................................................   4

WORK PLATFORM MAJOR COMPONENT IDENTIFICATION (SJKB-33i, 33C, 40i, 40C) ..................................   5

SECTION 2 OPERATION

OPERATOR QUALIFICATIONS ............................................................................................................................   1

OPERATOR RESPONSIBILITY FOR MAINTENANCE .........................................................................................     1

MAINTENANCE AND INSPECTION SCHEDULE .................................................................................................   1

OWNER’S ANNUAL INSPECTION RECORD .......................................................................................................   1

GENERAL MAINTENANCE HINTS .......................................................................................................................   1

OPERATING CONTROL IDENTIFICATION ..........................................................................................................   1

Base Controls - Electrical ......................................................................................................................................   2

Base Controls - Mechanical ...................................................................................................................................   3

Base Controls - Hydraulic ......................................................................................................................................   4

Platform Controls - Electrical .................................................................................................................................   6

OPERATING PROCEDURES ...............................................................................................................................   7

Prestart Checks .....................................................................................................................................................   8

Start and Operation ...............................................................................................................................................   8

Shutdown Procedure .............................................................................................................................................   9

Loading and Tie Down Procedure ..........................................................................................................................   9

BATTERY SERVICE AND CHARGING PROCEDURES ....................................................................................... 10

Battery Service ...................................................................................................................................................... 10

Battery Charger Procedures .................................................................................................................................. 10

BATTERY CHARGER OPERATION ..................................................................................................................... 11

BRAKE OPERATION TEST PROCEDURE .......................................................................................................... 13

LIST OF TABLES

TABLE  2-1. MAINTENANCE SCHEDULE ............................................................................................................ 12

TABLE  2-2. OWNERS ANNUAL INSPECTION RECORD .................................................................................... 13

TABLE  2-3. TIRE SPECIFICATIONS (SJKB-33N) ............................................................................................... 13

TABLE  2-4. MAXIMUM PLATFORM CAPACITIES ............................................................................................... 13

TABLE  2-5. GENERAL SPECIFICATIONS (SJKB-33N) ....................................................................................... 14

TABLE  2-6. TIRE SPECIFICATIONS (SJKB-33i, 33C, 40i, 40C) .......................................................................... 15

TABLE  2-7. STANDARD OPERATING TIMES (SJKB-33N, 33i, 33C, 40i, 40C) ................................................... 15

TABLE  2-8. GENERAL SPECIFICATIONS (SJKB-33i, 33C, 40i, 40C) ................................................................. 16

Page i

TABLE OF CONTENTS

SECTION 2, Page 18

SJKB Battery Powered

Table 2-6. Tire Specifications - SJKB-33i, 33C and SJKB-40i, 40C

        Mtwb203

FUNCTION TEST

SECONDS

Riser Up

32-36

Riser Down

24-26

Boom Up

16-18

Boom Down

24-26

Boom Extract (SJKB 33N, 33i, 33C)

19-23

Boom Retract (SJKB 33N, 33i, 33C)

14-16

Boom Extract (SJKB 40i, 40C)

30-34

Boom Retract (SJKB 40i, 40C)

20-22

Jib Up

12-14

Jib Down

10-12

Platform Rotate Left

7-9

Platform Rotate Right

7-9

Turret Rotate Clockwise

57-63

Turret Rotate Counter Clockwise

57-63

Table 2-7. Standard Operating Times - SJKB-33N and SJKB-33i, 33C and SJKB-40i, 40C

        Mtwb207

Model

Tire

Fill Specification

Size

Rating

Type

Pressure

SJKB-33C, 40C

10 x 16.5

10 Ply

Air

55 PSI

SJKB-33i, 40i

11 L 16SL

12 Ply

Air

55 PSI

SJKB-33C, 40C

(Lugged Flotation)

31 x 15.5 x 15

8 Ply

Air

55 PSI

SJKB-33i, 40i

(Ribbed Flotation)

31 x 13.5 x 15

8 Ply

Air

55 PSI

SJKB-33C, 40C

(Lugged Foam

Filled)

10 x 16.5

10 Ply

Solid Urethane

*

SJKB-33i, 40i

(Ribbed Foam

Filled)

11 L 16SL

12 Ply

Solid Urethane

*

HIGH FLOTATION

(Ribbed)

31 x 13.5 x 15

8 PLY

Solid Urethane

*

* 28 Durometer Fill installed at 55 psi.

Содержание SJKB-33i

Страница 1: ...son Ave St Charles IL 60174 FAX 630 262 0006 For Parts in North America and Asia please call 800 965 4626 Skyjack Inc Parts Center 990 Vernon Rd Wathena KS 66090 FAX 888 782 4825 For Parts Service in...

Страница 2: ...86psi 2 31 kg cm2 PIVOTAL HEIGHT 15 0 4 6m TAILSWING AT PIVOTAL HEIGHT ZERO TURRET ROTATION non continuous 365 degrees LIFE TIME minimum entry height to maximum platform height SJKB 33i 33C 95 seconds...

Страница 3: ...S SJKB 33N 14 TABLE 2 6 TIRE SPECIFICATIONS SJKB 33i 33C 40i 40C 15 TABLE 2 7 STANDARD OPERATING TIMES SJKB 33N 33i 33C 40i 40C 15 TABLE 2 8 GENERAL SPECIFICATIONS SJKB 33i 33C 40i 40C 16 Page i TABLE...

Страница 4: ...US INJURY THIS MACHINE IS NOT INSULATED MAINTAIN SAFE CLEARANCES FROM ELECTRICAL POWER LINES AND APPARATUS YOU MUST ALLOW FOR PLATFORM SWAY ROCK OR SAG THIS WORK PLATFORM DOES NOT PROVIDE PROTECTION F...

Страница 5: ...o the possibility of personal injury or death Follow the instructions in the safety message SCOPE OF THIS MANUAL This manual applies to the ANSI SIA CSA and CE versions of the SJKB battery powered wor...

Страница 6: ...ber for the return of any defective component s All items over 25 00 in value must be returned to Skyjack Inc WARRANTY STATEMENT 3 Fill out a Warranty Claim Form from dealer s supply of claim forms Th...

Страница 7: ...ng valves to control vertical movement Manual lowering valves at the base of the riser boom and jib cylinders allow the mechanism to lower in the event of an emergency or electrical system failure TUR...

Страница 8: ...hich have been altered or disabled SECTION 2 Page 13 SJKB Battery Powered Proper operation of the parking brakes should be checked daily or at the beginning of each shift Locate the machine in an appr...

Страница 9: ...Released Parking Brakes ANSI and CSA Standards Compliance OPTIONAL EQUIPMENT Operator Horn All Function Motion Alarm Descent Alarm Travel Alarm Flashing Amber Light Spring Loaded Half Gate Spring Load...

Страница 10: ...ve seconds later the CHARGER ON light will come on and at the same time the ammeter will indicate how much current is going to the batteries As the charge cycle continues which can last between 1 1 2...

Страница 11: ...t covered add distilled or demineralized water 3 Check each battery case for damage 4 Clean battery terminals and cable ends thoroughly with a terminal cleaning tool or wire brush 5 Make sure all batt...

Страница 12: ...the retract position Release the switch to stop 25 TO EXTEND THE BOOMARM Press and hold the Boom Extend Retract Toggle Switch to the extend position Release the switch to stop 2 Push in the Emergency...

Страница 13: ...counter clockwise to decrease function speed or clockwise to increase function speed The Boom Speed Control will affect all lifting lowering and rotate functions but will not affect drive or steer sp...

Страница 14: ...section push and hold this toggle switch to the down position Release switch to stop 4 JIB UP DOWN TOGGLE SWITCH This switch controls the up down movement of the jib To move the jib upward push and ho...

Страница 15: ...H 7 PLATFORM LEVELING TOGGLE SWITCH 8 PLATFORM ROTATE TOGGLE SWITCH 9 BOOM SPEED CONTROL ROTARY SWITCH 10 DRIVE STEER CONTROLLER 11 HORN PUSH BUTTON 12 TILT SENSOR INDICATOR LIGHT 13 FUNCTION ENABLE L...

Страница 16: ...eels being chocked 1 PARKING BRAKE RELEASE PLUNGER Located on the brake manifold in the hydraulic electric cabinet when this red plunger on the brake valve is depressed the brake valve opens allowing...

Отзывы: