English_IQ_8
NOTE: In case input water pressure is higher that 6 Bar (85 psi), install a pressure reducer. THE
BIBB CONNECTION PRESSURE SHOULD NEVER BE REDUCED.
3.2 STArT-UP
Once the installation instructions are followed (ventilation, site conditions, temperatures, water
quality, etc.), proceed as follows:
1. In the case of modular modules, remove the cover to access the installation kit (filters,
connection hoses, dispersion cones, etc.).
2. In case of compact models, open the deposit door to access the installation kit.
3. Open the water inlet. Verify the existence of leakages.
4. Connect the machine to the electrical network.
5. Verify that there are no vibrations or frictions on the elements.
6. After the 10 minutes of the timer installed in the electric panel, the machine will start the
operation.
7. In the case of modular models (mainly in three-phase equipments), having the cover removed,
verify that the motor is rotating in the correct direction.
8.Verify that after 15 minutes, the frost on the aspiration pipe is at 20 mm (0.78 in) of the compressor.
CAUTION:
INSTRUCT THE USER ABOUT MAINTENANCE, INFORMING THAT MAINTENANCE AND
CLEANING OPERATION AS WELL AS DAMAGES DUE TO THE LACK OF SUCH OPERATIONS:
ARE NOT INCLUDED ON THE WARRANTY.
The technical installer shall invoice traveling costs, hours and materials used on such operations.
MINIMUM
10 psi (0,7 Bar)
MAXIMUM
85 psi (6 Bar)
3| STArT-UP
3.1 PREVIOUS CHECKUP
a) Is the machine leveled?
b) Voltage and frequency are the same as those on the nameplate?
c) Are the discharges connected and operating?
d) ** If air condensed: Is the air circulation and its temperature appropriate?
e) ** Is water pressure appropriate?
MAXIMUM
43ºC / 109,40ºF 35ºC / 95ºF
MINIMUM
5ºC / 41ºF
5ºC / 41ºF
ROOM
WATER
Содержание ITV ICE QUEEN
Страница 1: ...EN ES FR DE PO IT EΛΛ DA NE SV BO PO PY CE TÜ التركيب دليل GRANULAR ICE USER MANUAL USER MANUAL ...
Страница 2: ......
Страница 129: ...IQ_129 ...
Страница 130: ...IQ_130 ...
Страница 131: ......