
SKLZ.com
STEP 3–
INSERT INTERNAL STRUCTURE POLES
Connect links of each Internal Structure Pole (D). Insert one end of the pole into the Base
Frame and the other end in the canopy pocket in the upper corner of the canopy. Secure pole
with velcro. Repeat with the pole on the opposite side.
STEP 4–
SECURE THE TEAM SHELTER TO THE GROUND
Check the frame to make sure it is secure and fully assembled with the canopy before securing
to the ground.
Place Team Shelter in the desired location and on level ground. Secure the shelter to the
ground with the included Ground Stakes (E). Press each stake into the ground with your hand,
foot or mallet.
For windy conditions use Tie-cords (F) to further secure the Team Shelter. Secure one side of
the Tie-cord to the upper rear Tie-cord loop and stake the other side to the ground. Repeat
on the opposite side.
NOTE: Care should be taken when securing the Ground Stakes. Base Frame tubing can be
bent if driven too far into the ground. Do not use Ground Stakes on the back bar of
the Base Frame as it will bend and tension system will not function properly.
CAUTION: Make sure the Team Shelter is secured into the ground before use. During use
make sure the Ground Stakes are secured. Loose Ground Stakes may cause injury.
STEP 5–
ADJUST AIRFLOW
To increase airflow, open side zippered windows or roll up side flaps.
To roll up side flaps remove each toggle from each canopy strap
grommet. Roll-up the side flap and secure with ties.
TEAM SHELTER ASSEMBLY:
STEP 1–
BASE FRAME AND TENSION-TITE™ POLE ASSEMBLY
Lay out one Tension-Tite Pole (B) and connect links to form a straight pole. Repeat with
second Tension-Tite Pole. Lay out Base Frame (C) and link the frame together. Secure the Base
Frame tubing with the click-lock push buttons.
Slide the Tension-Tite Poles into the fitting hole in each corner of the Base Frame. Ensure
poles are fully inserted. Failure to do so may result in damage to the Team Shelter.
NOTE: The slight bowing on the Base Frame is part of the Tension-Tite system design.
STEP 2–
CONNECT THE CANOPY TO THE FRAME
Unfold the Team Shelter Canopy (A) and connect the corner canopy pin to the top of the
Tension-Tite Pole. Ensure the Team Shelter logo on the canopy is facing away from the frame.
Repeat on the other side.
Connect the grommets on the bottom of each canopy strap to the Base Frame. Insert each
canopy toggle clip into each canopy strap grommet and snap each canopy clip connector to
each Tension-Tite Pole and Base Frame.