PRODUCT INFORMATION MANUAL
SECTION: 9G-B DUETTE
®
VERTIGLIDE
™
SIDE STACK DESIGN
POWERVIEW
®
MOTORISATION
ISSUE DATE: NOVEMBER 2017
ORIGINATOR: SKILTEC
REPLACES ISSUE DATE:
APPROVED BY: D.ALTIPARMAKOVA
PAGE 6
Face Mount
Mount the Installation Brackets
■
Center the headrail over the window opening at the desired height. Use a pencil to mark
each end of the headrail. (On the stacking side, the end of the white gearbox counts as the
end of the headrail.)
➤
Alternatively, measure the width of the headrail and use that width to mark the headrail
end points.
■
Mark end bracket locations 200mm in from each end of the headrail.
➤
Mark the locations of any additional brackets, spaced evenly between the two end
brackets. Mount into wood whenever possible.
■
Determine where to place the top of the installation brackets.
➤
Add the desired floor clearance to the ordered
height of the shade. The ordered height can be
found on the packaging label. A minimum of 13mm
floor clearance is recommended.
➤
Measure the total distance up from the floor. This is
where to place the top of the installation brackets.
➤
A minimum flat vertical surface of 32mm is required
to mount the brackets.
CAUTION:
The rear of the brackets must be flush
against a flat mounting surface. Do not mount
brackets on curved molding.
■
Center the brackets on your marks and mark the screw holes.
➤
When using extension brackets, mark two screw holes
per bracket.
Headrail End Marks
Window/Door Opening
8"
8"
Space Evenly
Space Evenly
Top of
Bracket
Floor Clearance
Ordered
Shade
Height
Содержание DUETTE VERTIGLIDE SIDE STACK DESIGN POWERVIEW MOTORISATION 9G-B
Страница 2: ......