
Sicherheitskonzepte Breuer GmbH
Broekhuysener Straße 40, 47638 Straelen, Tel.: +49 2834 943 01 00, Fax: +49 2834 943 05 62
[email protected], www.sicherheitskonzepte-breuer.com
8
Assembly steps
1
To mark the four boreholes, place the base plate on the concrete slab with an edge distance of 650 mm to the concrete edge (not to
building edge)
Figure 1
2
Bore the four ø 10 mm boreholes perpendicular to the concrete surface 85 mm deep in the concrete.
Figure 2
3
Remove the generated dust from the concrete slab (e.g. with hand brush).
Figure 3
4.
Blow-out the boreholes 2 times.
Figure 4
Installation
variant
650
65
0