SKB Primo 27 AD Скачать руководство пользователя страница 3

 

Sicherheitskonzepte Breuer GmbH 

Broekhuysener Straße 40, 47638 Straelen, Tel.: +49 2834 943 01 00, Fax: +49 2834 943 05 62 

[email protected], www.sicherheitskonzepte-breuer.com   

 

 

 

 

 

 

3

 

This  instruction  manual  is  supplied  with  every  Primo  anchor  device.  It  must  be  read  before  use  and  stored  in  close  proximity  to  the 
equipment at all times.  
The assembly of the anchor device is described in a separate manual. 
 

Caution:

 Only original parts may be used! 

Please check the roof construction before assembly, i.e., always check whether the surface is suitable for attaching the anchor device.  If in 
doubt, contact a structural engineer. 
The Primo anchor device may only be used with safety harnesses in accordance with DIN EN 361, energy absorbers in accordance with DIN 
EN 355 and lanyards in accordance with DIN EN 354 for fall protection, according to the instruction manual of the respective manufacturer. 
The lanyard should be equipped with a length adjustment in accordance with DIN EN 354. The opening of the carabiner hook must exceed 
16 mm. 
It is essential for safety that following a fall or when damage (cracks or breakages) are found, the product is only used again after obtaining 
the written consent of an expert.  
 
The information in the corresponding instruction manual must be observed.  

 
Load capacity 

 

max. three persons per anchor point (Primo) 

 

Before each use of the Primo  

A visual and functional inspection must be conducted for the following points: 
 

 

Corrosion 

 

Deformation 

 

Damage (e.g. distortion or cracks) 

 

Label (nameplate) present 

 

Wobble test (perform manually at the anchor point) 

 

Ring bolt secure (screwed all the way in, firm position of the ring bolt)   

 

Check legibility 

 

Application: 

 

Before entering areas where there is a risk of falling (e.g. walking on the flat roof): 

Always check whether the components of the personal protective equipment against falling from a height are in order and whether they 
comply with that specified in this instruction manual and/or on the inspection card. 
System components must be checked for completeness and correctness.  
 
The other personal protective equipment against falling from a height must be checked for external signs of damage and for completeness 
before use, in accordance with the associated instruction manuals. 
 

After entering areas where there is a risk of falling (e.g. walking on the flat roof):

  

The Primo anchor device can be used as a single anchor point, i.e., the person to be protected hooks the carabiner hook of his/her personal 
protective equipment against falling from a height directly into the eyelet of the anchor point. In this case, no more than 3 persons may be 
secured per eyelet.  
 

Caution:

 Unlocked carabiner hooks can inadvertently release from the anchor point! 

 

 

Содержание Primo 27 AD

Страница 1: ...cumentation in accordance with DIN EN 795 2012 Class A Primo 27 AD This instruction manual including a test log must be read before first use and kept with the equipment for its entire service life Only persons who are familiar with this instruction manual may use the system ...

Страница 2: ...ations in all potential emergency situations No changes or additions may be made to the equipment without the prior written consent of the manufacturer All maintenance may only be performed in accordance with the measures specified by the manufacturer Combining individual elements of this equipment can cause hazards which can impair the safe function of the system Therefore please ensure that the ...

Страница 3: ...ruction manual must be observed Load capacity max three persons per anchor point Primo Before each use of the Primo A visual and functional inspection must be conducted for the following points Corrosion Deformation Damage e g distortion or cracks Label nameplate present Wobble test perform manually at the anchor point Ring bolt secure screwed all the way in firm position of the ring bolt Check le...

Страница 4: ... one metre of safety clearance The permitted strain caused by building edges and the maximum usage length when using a restraint system must also be observed Cleaning Metal components must be cleaned by wiping with a cloth after use Other cleaning methods chemical cleaning etc are not permitted Repairs and inspections Repairs to the anchor device may only be performed by the manufacturer or an exp...

Страница 5: ... Meaning of the markings 1 Product designation and type designation 2 Manufacturer 3 Standard 4 Number of users 5 Batch number 6 Year of manufacture 7 Symbol to indicate that the instruction manual must be observed Manufacturer Notified body involved in the type examination Sicherheitskonzepte Breuer GmbH DEKRA EXAM GmbH Broekhuysener Straße 40 Dinnendahlstr 9 47638 Straelen 44809 Bochum 3 2 1 ...

Страница 6: ... a year to be organised by the builder Manufacturer Sicherheitskonzepte Breuer GmbH Broekhuysener Straße 40 47638 Straelen Type designation Primo 27 AD Year of manufacture Standard DIN EN 795 2012 Class A Date of purchase Serial number Date of first use Operator Date Reason for revision periodic inspection or maintenance Damage found repairs performed etc Name signature of competent person Date of...

Страница 7: ...0 mm Torque spanner M 17 Fixing element Fischer anchor bolt FAZ II 10 10 A4 Assembly preparation Before installing the Primo 27 AD the load capacity of the roof construction must be checked The technical specifications must be adhered to The General Type Approval must be observed in planning and assembly The maximum force which can be exerted in practice from the anchor device into the structural ...

Страница 8: ... mark the four boreholes place the base plate on the concrete slab with an edge distance of 650 mm to the concrete edge not to building edge Figure 1 2 Bore the four ø 10 mm boreholes perpendicular to the concrete surface 85 mm deep in the concrete Figure 2 3 Remove the generated dust from the concrete slab e g with hand brush Figure 3 4 Blow out the boreholes 2 times Figure 4 Installation variant...

Страница 9: ...b and insert all four heavy duty anchors of the anchor device and hammer in 6 Screw in the heavy duty anchor clockwise using a torque spanner and tighten with 45 Nm 7 Position the eyelet and screw in clockwise Tighten until the ring bolt cannot be manually released 8 Only with single anchor point To secure the eyelet apply adhesive to the ring bolt with high strength screw lock e g Loctite Figure ...

Страница 10: ...uilding type Supplement Roof shape Address Contact person Post code Place Telephone Address Assembler Post code Place Email Telephone Extension Component 1 expected component thickness Component 2 expected component thickness Material Setting data Bore Ø 10 mm Minimum component thickness Concrete min 100 mm Bore depth 85 mm Torque 45 Nm Hammer drill Boreholes cleaned 2x Tightened with 45 Nm Drill ...

Страница 11: ...sed No extra concrete Building Type Approval Z 14 9 710 taken into account Anchor point Nm Anchor point Nm Anchor point Nm Anchor point Nm Anchor point Nm 1 10 19 28 37 2 11 20 29 38 3 12 21 30 39 4 13 22 31 40 5 14 23 32 41 6 15 24 33 42 7 16 25 34 8 17 26 35 9 18 27 36 Remarks Date Assembly Company Signature Assembler Manufacturer Breuer Sicherheitskonzepte GmbH Broekhuysener Straße 40 47638 Str...

Страница 12: ...lation documentation in accordance with DIN EN 795 2012 Class A Primo 27 AD Sicherheitskonzepte Breuer GmbH Broekhuysener Straße 40 47638 Straelen Tel 49 0 2834 943 01 00 Fax 49 0 2834 943 05 62 info sicherheitskonzepte breuer com www sicherheitskonzepte breuer com ...

Отзывы: