background image

 

 

HPS-1004GP

 

User’s Manual

 

 

 

3.

 

Cable Connection 

 

1)

 

To connect the cable to the power outlet after connecting the power cable to 220V 

AC input terminal. 

2)

 

To push and insert RJ-45 connector of UTP cable, which is linked from PoE Port 

(Port 1-4) of HPS-1004GP, to PD until it makes the ratting sound. 

3)

 

Link led will turn on when the power is normally supplied to PD.  

You can confirm that PWD Led and Port Link, PoE Link Led (1-4) turn on if all are 

normally installed. 

 

4.

 

System Composition 

 

 

Front side 

 

 

System Status 

LED 

Color

 

Status

 

Explanation

 

On (Green)  Fan is normally operated. 

FAN 

Green 

Off 

Fan is under the stop status. 

On (Green)  System is normally operated. 

Flicker (Green) 

System is under booting. 

ACT 

Green 

Off 

System is not normally operated. 

On (Green)  Power supply is normally operated. 

PWR 

Green 

Off 

Power supply is not normally operated. 

 

Содержание HPS-1004GP

Страница 1: ... User s Guide Class A Device Broadcasting communication Apparatus and Materials for Business This is an electromagnetic wave shielding apparatus for business use as Class A to which either its seller or user shall pay an attention and it is intended to be used everywhere ...

Страница 2: ...tly linked to the wire PA It can monitor the cost saving effect and overall network power as the data and power are supplied to the PD Powered Device terminal by using the cable such as UTP CAT5 CAT6 and etc under the standard Ethernet infra structure Also PoE L2 Switch does not require any separate electric power work in installing the wire AP and it is possible to construct non stop system throu...

Страница 3: ... on when the power is normally supplied to PD You can confirm that PWD Led and Port Link PoE Link Led 1 4 turn on if all are normally installed 4 System Composition Front side System Status LED Color Status Explanation On Green Fan is normally operated FAN Green Off Fan is under the stop status On Green System is normally operated Flicker Green System is under booting ACT Green Off System is not n...

Страница 4: ... Status Explanation On Port is being operated and it is being linked to the counter equipment Flicker Data is being transmitted through the port WAN Green Off Port is not linked to PoE or the power is not being supplied SFP Link Port 6 7 LED Color Status Explanation On Port is being operated and it is being linked to the counter equipment Flicker Data is being transmitted through the port LINK ACT...

Страница 5: ...00 POE port RJ 45 1 each of WAN Gigabit Ethernet 10 100 1000 RJ 45 1each of console port RJ 45 Module composition Body 2 each of SFP Gigabit Ethernet Currency 56 60Hz Input voltage 100 240VAC Power AC power Supplier Scope of input voltage 88 264VAC Operation temperature 20 60 C Temperature Custody temperature 40 80 C Operation humidity 10 95 40 C un setting Operation environment Humidity Custody h...

Страница 6: ...is applicable to the charged service conditions even with the guarantee period the repair will be made by receiving the service charge Charged Service In case it is applicable to the following charged service conditions even within the guarantee period the service charge Repair charge parts fee travel charge will be requested 1 In case the trouble occurs from the careless treatment of the customer...

Страница 7: ...ny inconvenience or enquiry during use please visit the homepage http www happyelec com or enquire to the buying place Happy Electronics Co Ltd 463 760 A 805 Bundang Technopark 150 Yatap dong Bundang gu Seongnam si Gyeonggi do Korea Customer Support 82 70 8888 8764 ...

Отзывы: