
10
OPERATING PROCEDURE
Step
1
Switch on the POWER and Initial boot-up screen is displayed. Switch on STEAM and
alarm signal goes off once initiating LCD Display and beginning to run the product
according to programming.
Note!
“OPERATING PROCEDURE” is repeated if users resume the operation after draining
all the water out of the steam vessel completely.
2
Main Screen
Description
● Switch on the POWER and Initial boot-up screen is displayed with the following
information.
→ MAIN BOARD VERSION
→ DISPLAY BOARD VERSION
→ OPERATING TIME
→ OPERATING STATUS MESSAGES
3
Main Screen
Description
●
Switch on STEAM. Operating status messages and error signals are displayed.
●
Activate water pump to supply water to the steam vessel.
●
Programmed water pump running time:
→ 5 min.