INSTALLING THE VERTICALMASTER
®
II
Warning:
Do not install switch in direct fl ow of incoming
liquid.
1. Determine desired activation level and pumping range
as shown in Figure D. Pumping range can be adjusted
by moving the fl oat stop up or down the rod.
2. Insert hose clamp through slots in mounting bracket as
shown in Figure E.
3. Position hose clamp around discharge pipe with bracket
gripping tabs against pipe as shown in Figure E and F.
Cable should remain outside of hose clamp.
4. Tighten the hose clamp securely.
5. Secure pump cable and switch cable to discharge pipe
as shown in Figure D with wire ties (not supplied).
6. Check the installation. Verify that the fl oat is free to
move and activate the switch. Allow system to cycle to
ensure proper operation.
Note:
All hose clamp components are made of 18-8
stainless steel material. See your SJE-Rhombus
®
supplier for replacements.
Figure D
Figure E
MOUNTING THE VERTICAL REED SWITCH
Warning:
Do not install switch in direct line of incoming
liquid.
1. Determine desired activation level and pumping range
as shown in Figure F. Pumping range can be adjusted
by moving the fl oat stop up or down the rod.
1. Place the clamp into the VRS switch housing as shown
in Figure G.
2. Locate clamp at desired activation level and secure the
clamp to the discharge pipe as shown in Figure F & G.
Note:
Do not install cord under hose clamp.
3. Tighten the hose clamp using screwdriver. Over
tightening may result in damage to the switch housing.
4. Check installation. Allow system to cycle to insure
proper operation.
Note:
All hose clamp components are made of 18-8
stainless steel material. See your SJE-Rhombus
®
supplier for replacements.
Figure G
alarm
activation
level
VRS switch
activation
level
pumping
range
secure
cables
to
discharge
pipe
high water
alarm
Figure F
activation
level
pumping
range
secure
cables
to
discharge
pipe
high water
alarm