Installing the Float Switches
The Model 124 Single Phase Duplex control panel operates with
fl oat switches. They activate pump STOP, LEAD pump START,
LAG pump START and high-level ALARM functions.
Mounting the Control Panel
1
2
3
CAUTION!
NOTE
Ensure all power is turned OFF
before installing fl oats in tank.
Failure to do so could result in
serious or fatal shock.
If the fl oats are not properly mounted and connected in the correct
order, the pumps will not function properly.
Label each fl oat and cord end
with the provided pairs of
STOP, LEAD, LAG, and ALARM
stickers.
If the distance to the control panel exceeds the length of
the fl oat switch cords or the pump power cord, splicing
in a liquid-tight junction box will be required. For outdoor
or wet installation, we recommend an SJE Rhombus UL
Type 4X junction box.
2
LEAD
LEAD
STOP
STOP
Lag
Lag
Lag
Alarm
Stop
Stop
Stop
Alarm
Lead
Lead
Lead
Alarm
Operating
range
Make sure hose clamp
band does not interfere
with fl oat operation.
Do not install cord under
hose clamp.
Tighten
the
clamp.
Floats require free range of motion.
They must not touch each other or any equipment in the pump chamber.
Hose clamp is 18-8
stainless steel.
3.5”
(9cm)
Pipe Clamp Mounting
4 Float Operation
Pipe Clamp Mounting
3 Float Operation
Lag/Alarm
Stop
Stop
Stop
Lag/Alarm
Lead
Lead
Lead
Lag/Alarm
Operating
range