Registered in England No. 08405712
VAT Registration No. GB163 04 0349
Siretta Ltd
Basingstoke Road
Spencers Wood
Reading
Berkshire RG7 1PW
sales
email
web
+44(0)118 976 9000
www.siretta.com
22
ZETA-xxP Series
Hardware Manual
rev
D
PWRON_IN is the power on signal (pin 4 of the RJ12 power connector). Taking
PWRON_IN high will turn the ZETA-xxP on (assuming there is power applied, but that
the unit has been turned off using PWROFF_IN pin).
During power up, the green and blue LEDs are controlled directly by the ZETA-
xxP power management process, and the red LED is controlled by the embedded
modem module. While the ZETA-xxP is in the powering up process, the Green LED
will flash rapidly (500mS on, 500mS off) and the Blue LED will be off until the power
up process is complete.
ZETA-NLP Variants
After the power on process has completed, the red, green and blue LED’s are
disabled completely to save power whilst it is in an operating state. The green LED
will briefly flash once every 30 seconds to indicate that the modem is on.
ZETA-NSP, ZETA-NEP and ZETA-GEP Variants
After the power on process has completed the red, green and blue LED’s are
controlled directly by the module using the standard set of AT commands described
on
.
PWRON_IN Power On Procedure LED Indicators
PWROFF_IN is the power off signal on pin 3 of the RJ12 power connector. Taking
PWROFF_IN high will turn a powered ZETA-xxP off.
During power off, the green and blue LEDs are controlled directly by the ZETA-xxP,
and the red LED is controlled by the embedded modem module. While the ZETA-
xxP is transitioning through the power off state the Blue LED will flash rapidly (500mS
on, 500mS off) and the Green LED will be off until the power off process is complete
when all LEDs will be off. In this state, PWRON_IN may be used to turn the unit on
again.
ZETA-NLP Variants
After the power off process has completed, the Red, Green and Blue LED’s are
disabled completely. The blue LED will briefly flash once every 30 seconds to indicate
that the modem is in the off state.
ZETA-NSP, ZETA-NEP and ZETA-GEP Variants
After the power off process has completed the Red, Green and Blue LED’s are off.
PWROFF_IN Power Off Procedure LED Indications