![Sinclair SDV5 Series Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/sinclair/sdv5-series/sdv5-series_service-manual_1280231010.webp)
201805
7
Caution
All installation, servicing and maintenance must be carried out by competent and suitably qualified, certified
and accredited professionals and in accordance with all applicable legislation.
Units should be grounded in accordance with all applicable legislation. Metal and other conductive components
should be insulated in accordance with all applicable legislation.
Power supply wiring should be securely fastened at the power supply terminals – loose power supply wiring
would represent a fire risk.
After installation, servicing or maintenance, the electric control box cover should be closed. Failing to close the
electric control box cover risks fire or electric shock.
Switch ENC1 (indoor unit capacity setting) is factory-set and its setting should normally not be changed. The
only circumstances in which a switch ENC1 might need to be set in the field is when replacing a main PCB.
When replacing a main PCB, ensure that the capacity setting on switch ENC1 on the new PCB is consistent with
the unit capacity given on the unit’s nameplate.
Notes for installers and service engineers
Содержание SDV5 Series
Страница 1: ...INDOOR FLOOR CEILING UNITS SDV5 xxFA C O M M E R C I A L A I R C O N D I T I O N E R S S D V 5...
Страница 9: ...6 201805 5 Wiring Diagram Figure 5 1 Ceiling floor wiring diagram...
Страница 22: ...FLOOR CEILING UNITS SDV5 36 140FA C O M M E R C I A L A I R C O N D I T I O N E R S S D V 5...
Страница 23: ...SDV5 36FA...
Страница 26: ...SDV5 45FA...
Страница 29: ...SDV5 56FA...
Страница 32: ...SDV5 71FA...
Страница 35: ...SDV5 80FA...
Страница 38: ...SDV5 90FA...
Страница 41: ...SDV5 112FA...
Страница 43: ...SDV5 140FA...