![Sinclair ASH-09AF Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/sinclair/ash-09af/ash-09af_operational-manual_1280131021.webp)
13
Install Part
blue
brown
yellow-green
4.Connect blue wire in power connect wire onto "N(1)" terminal, brown wire onto "2" terminal,
power connect wire by wire groove that in front of line bank that installed in electric box.
5.To heat pump type unit, signal control wire connect with indoor unit through connector
as (shown in fig.3), and tighten the control wire by wire clamp on bottom of case.
6.Install the cover plate on where it was and tighten screws.
7.Cover panel.
Signal control wire (only for heat pump units)
Fig.3
☆
Install Indoor Unit
1.
Please refer to the fig. (a) and (b) for routing piping type of indoor unit. When routing the
piping (wiring) from the left or right side, cut off the tailings of the pipe left from chassis
of main unit (as shown in fig.4(c)):
(2)
Cut off tailings 1 and 2 when connection pipe and power cord are routed.
wire
Wire clamp
Connector
Wire
Line bank
yellow-green wire (i.e. earth wire) onto " " terminal (as shown in fig.3); and press the
gloove
Power connect
(1)Cut off tailings 1 when only power cord is routed;
Содержание ASH-09AF
Страница 31: ...30 ...