SIMTECH
Phone: 877-777-2467 • Fax: 215-547-9129
www.SimtechUSA.com
7
1.081210
Weld
Tech -
Hand Held Socket Tool
Notes
Страница 1: ...www SimtechUSA com Corrosion Resistant Fluid and Air Handling Systems WeldTech Socket Hand Held Tool Operation Manual ...
Страница 2: ...nal tension Regularly check the cables and the plug If the cable needs to be replaced please contact factory Never unplug the power supply by pulling the cable Never carry the machine by the cable Before using the machine always check that the handle is dry The heater is extremely hot it s strongly suggested to use suitable gloves Before packing away the machine wait for the complete cooling of th...
Страница 3: ...stand Table clamp stand PTFE heater bushings 20mm 25mm 32mm 40mm 50mm 63mm 75mm 90mm and 110mm Adjusting tools and fasteners Electrical requirements 110 1Ph 60Hz 20mm through 63mm Complete Unit includes Metal carrying case Table stand Table clamp stand PTFE heater bushings 20mm 25mm 32mm 40mm 50mm and 63mm Adjusting tools and fasteners Electrical requirements 110 1Ph 60Hz ...
Страница 4: ...the appropriate temperature 260C You can set the required temperature by pushing the up down arrows Wait until the yellow temperature indicator light goes off before proceeding with the weld Pipe must be cut square and the end must be chamfered The fitting interior should be thoroughly cleaned using a cleaning agent The pipe end should be chamfered on the outside Pipe insertion depth must be marke...
Страница 5: ...0 4 8 8 12 12 16 16 21 25 32 3 3 3 5 5 5 5 7 7 7 6 12 12 18 18 24 24 30 40 50 2 2 2 4 4 4 6 6 6 8 Clamped sec sec sec OD MM OD Inches Total min Pipe Insertion Time Cooling Time Maximum Changeover Time 3 8 1 2 3 4 1 1 1 4 1 1 2 2 2 1 2 3 4 16 20 25 32 40 50 63 75 90 110 8 10 15 18 22 35 45 60 75 80 4 4 4 6 6 6 8 8 8 10 8 10 15 15 20 20 30 30 40 50 2 2 2 4 4 4 6 6 6 8 Pipe Insertion Time Cooling Tim...
Страница 6: ...off before inserting If at the end of any weld there is any material left onto the bushing just use a clean wipe to remove it from the Teflon coated surface of the bushing If the material is left onto the bushing after all welds performed check the following a Your pre heating time you are heating too long b Your temperature setting may be too high you have a 10 C window to adjust your temperature...
Страница 7: ...SIMTECH Phone 877 777 2467 Fax 215 547 9129 www SimtechUSA com 7 1 081210 WeldTech Hand Held Socket Tool Notes ...
Страница 8: ...imtech Industrial Products Inc of defective or nonconforming material To the maximum extent permitted by law Buyer irrevocably waives all claims for money damages relating to the condition use and performance of the goods purchased In no event shall Simtech Industrial Products Inc liability exceed the purchase price of the product sold by Simtech Industrial Products Inc In no event whether because...