
Connect horizontal pipe section to the Tee
branch.
5. Holding the pipe at the proper elevation,
install the Storm Collar and Cap, as described
in Step 11
for the fireplace installation.
6. Connect the horizontal Pipe Section through
the masonry to the Tee by pushing it through
the hole in the masonry, and lining it up with
the branch of the Tee. Then insert Pipe Section
into the Tee, while twisting to lock it.
7. Once the horizontal Pipe Section is in place,
the space between the pipe and the masonry
may be filled with high temperature grout, if
desired (Figure 27).
8. Install the Reduction Collar or Trim Collar
over rough opening, then 90° Elbow, and
the required vertical Pipe Sections down to
the appliance. An Adjustable Pipe length will
probably be needed, as well as an Appliance
Adapter or Increaser Adapter.
9.
Conduct a final inspection of the entire job,
and review the manufacturer’s operating and
installation instructions once more, before
firing the appliance.
Figure 27
18
INSTALLATION IN A
CATHEDRAL CEILING
1. Mark a line on the side of the Cathedral
Ceiling Support Box to correspond to the line
of the roof pitch, as shown in (Figure 28).
Allow for the Support Box to protrude below
the low side of the finished ceiling a minimum
of 2 inches.
2. Position the appliance at its proper
location on the floor. Pay close attention to
the manufacturer’s installation instructions
regarding the clearance to combustibles, etc.
Position appliance so Support Box will not
interfere with roof rafters or other structural
framing.
3.
Run a plumb line from the center of the flue
exit on the stove to the ceiling. Mark the point
on the ceiling where the plumb line intersects.
This represents the center of the support box.
Drill a small hole through the ceiling at this
point, so it can be located from the top of the
roof.
4. From the roof, locate and mark the outline of
the Support Box.
5. Remove shingles or other roof covering as
necessary to cut the rectangular hole for the
Support Box. Cut the hole 1/8-inch larger than
the dimensions of the Support Box (Figure
29). The rectangular hole should be centered
on the small hole which you drilled through the
ceiling to mark the location. Again, verify that
you are not cutting through rafters or framing
members.
6. Run the Support Box through the roof as shown
in (Figure 30), and place it so that the bottom of
the Support Box protrudes at least 2 inches below
the low side of your opening in the finished ceiling
(Figure 31). Align the Support Box vertically and
horizontally with a level. Temporarily tack the
Support Box in place through the inside walls and
into the roof sheathing.
NorthlineExpress.com
http://www.northlineexpress.com
Toll-Free 1-866-667-8454
Содержание PelletVent Pro
Страница 16: ...Figure 23 Figure 25 Figure 24 16 NorthlineExpress com http www northlineexpress com Toll Free 1 866 667 8454...
Страница 22: ...22 NorthlineExpress com http www northlineexpress com Toll Free 1 866 667 8454...
Страница 23: ...23 NorthlineExpress com http www northlineexpress com Toll Free 1 866 667 8454...