Simply Automated DKIT-05 Скачать руководство пользователя страница 8

Getting Started DKIT-05 

Landscape-Outdoor Lighting Kit

 

Simply Automated, Incorporated 

6108 Avenida Encinas, Suite B, Carlsbad, CA  92011 USA 

Technical Support:  

www.simply-automated.com

 or 

800-630-9234

 

  452-0001-0005WEB Rev. B   Revised: September 22, 2011

 

 
 

The scheduler will show the first event “01)”.  With the cursor in the event 

        

um er field, press the Dow  button

ime to scroll to the next event “02)”. 

        

u pass 019, press the Down button to go back, so 

“019” is in the device ID field.  

        

 

 

lower case if you do not want this event to run on that day. 

        

de to “R” run, so the event will be active in the 

        

plus 15 minutes “DSK+15” (or your desired ON time).   

        

scroll the OFF time to dawn (sunrise) “DWN+00” (or your desired OFF time).   

        

Down button to set the Event type to “D0”, 100% ON.  

       

 

   button saves the changes made.  Pressing Menu button will exit back to the 

y toggling between ON and OFF each time Enter 

   is pressed. 

F at dawn, when the scheduler is in the normal runtime (RUN) schedule

2)”:

 

. With the scheduler plugged into power, the Idle screen should be 

        

        

01)018 SMTWTFS R
DSK+00 11:00P D0

n

b

n

 one t

 

 

 

 

 

 

         

With the cursor highlighting the event number “02)", press the Right button to 

move the cursor over to the Device ID number field.  Press the Up button to scroll 
up to Device number 019.  If yo

 

 

Press the Right button to move the cursor over to the days of the week field.  Pressing the Up or Down button

on any of the days of the week will change the capital letter to a lower case letter.  Capital letter indicates an 
ON day; lower case indicates an OFF day for this second “02)” event.  Leave all the initials of the days of the
week (Sunday through Saturday) capitalized if you want the event to run every day; or change any day to a 

02)---SMTWTFS R
12:00A 12:00A LA

02)019 SMTWTFS R
12:00A 12:00A LA

 

Press the Right button to move the cursor to the event mode field.  Using the Up 

or Down buttons set the event mo
normal runtime schedule mode. 

 

Press the Right button to move the cursor to the hours segment (not the 

minutes) of the ON time field.  Press the Up button to scroll the ON time to dusk 

 

Press the Right button to move the cursor to the hours segment of the OFF time field.  Press the Up button to 

02)019 SMTWTFS R
DSK+15 DWN+00 LA

02)019 SMTWTFS R
DSK+15 DWN+00 DO

 

Press the Right button to move the cursor to the Event Type field, then press the 

 

 

Press the Enter    button to save the event.  You’re done setting the second event. 

 

Helpful Hint:  Pressing the Enter

enu without saving changes. 

M

 

Helpful Hint:  Pressing the Enter 

   button when the cursor is on the Event number (e.g. “02”) will test the event 

b

 
 

Section 4.d. Testing Event 02) for Relay Module #019 

   

The second relay module #019 (as labeled on the back of the unit) was set to turn ON at dusk plus 15 minutes 
and OF

 mode.  To test this second event 

“0

 

Test Event 02)

isplayed:   

d

 

From the Idle screen press the Down button and the first event will be displayed, 

press the Down button a second time to view the second event “02)”.  

 

With the cursor on “02)” press the Enter 

   button to activate (turn on) the event.  

Press the Enter 

  button again to deactivate (turn off) the event.  You should see 

the relay module #019 and the connected load (transformer) turn ON and OFF as you press the Enter    
button. 

02)019 SMTWTFS R
DSK+15 DWN+00 DO

 

Helpful Hint:  If the connected load (transformer) does not turn ON/OFF, check that the relay module controlling 
the load is labeled #19 (on the back of the unit) and make sure the event was saved correctly (e.g. matches 

icture above with “DO” shown on the bottom right of the display).  Check that the relay module is powered  

p

Содержание DKIT-05

Страница 1: ...Lighting Relay Starter Kit Model DKIT 05 Simply Automated Pre Configured SimplySmartTM Series Utilizes SimplySmartTM technology to make installation a breeze No computer programming required Simple n...

Страница 2: ...t Includes 2 Appliance relay Modules and 1 Scheduler Timer Controller Getting Started Section 1 Very Important Pre Installation Notes Your home should be no more than 2500 square feet and have only on...

Страница 3: ...trolled by the scheduler or other pre configured scene controllers Go to the location of the second relay module labeled 19 and repeat the steps above to ensure the relay module and the connection to...

Страница 4: ...Right or Left button to the Day of the Week field and use the Up or Down buttons to set the day of the week Find an accurate clock e g cell phone time referenced on a TV station or go to www time gov...

Страница 5: ...ter button and the scheduler will calculate sunrise dawn and sunset dusk for your location Press the Enter button again to save these settings and return to the main Menu You are done setting the Loca...

Страница 6: ...be set to turn ON at dusk and OFF at 11PM when the scheduler is in the regular runtime RUN schedule mode If you would like to set ON OFF times other than Dusk 11PM feel free to do so Set Event 01 Wit...

Страница 7: ...he cursor on 01 press the Enter button to activate turn on the event Press the Enter button again to deactivate turn off the event You should see the relay module 18 and the connected load transformer...

Страница 8: ...ge any day to a 02 SMTWTFS R 12 00A 12 00A LA 02 019 SMTWTFS R 12 00A 12 00A LA Press the Right button to move the cursor to the event mode field Using the Up or Down buttons set the event mo normal r...

Страница 9: ...b Section 4 e Setting Event 03 for a Group SCENE of Modules The relay modules 018 and 019 as labeled on the back of the units are pre configured to operate with the optional 4 and 8 button scene contr...

Страница 10: ...when pressing the Enter bu ection 6 S Section 4 g Other Functions of the Scheduler Timer To learn more about the Scheduler Timer and functions such as deleting an event or setting randomness please r...

Страница 11: ...0 square feet and have only one breaker panel A phase coupler is required in some home installations especially homes 2500 square feet or homes with more than 1 breaker panel If you have tested the sc...

Страница 12: ...p to 250 devices using your PC and UPStart software Devices include single rocker dimmers deluxe dimmers with different faceplates up to 8 buttons lamp or appliance modules tabletop pedestal with 4 or...

Отзывы: