42
4.1
ACTIVATION AND
SIT 820 NOVA mV
GAS VALVE
ADJUSTMENT (fig. 7)
-.Check.that.both.the.system.and.boi-
ler.are.full.of.water.and.fully.vented..
Remove.the.inlet.pressure.gauge.on.
the.gas.valve.(7).and.engage.a.water.
column. gauge.. Open. the. gas. cock..
Check.that.the.upstream.gas.pres-
sure. is. equal. to. or. slightly. higher.
than.20.mbar..(Attention:.if.pressure.
exceeds.37.mbar,.insert.the.pressu-
re.reducers.upstream.the.boiler.or.
boiler.room).
-.Rotate.the.control.knob.(1).to.the.pi-
lot.position..Fully.press.the.control.
knob..The.gas.will.start.leaking.from.
the. pilot.. Switch. the. pilot. on. using.
the. piezoelectric. activator.. When.
the.pilot.is.on,.wait.about.20.minutes.
before. releasing. the. control. knob..
The.pilot.will.remain.on..Otherwise,.
repeat.the.operation.
-.Rotate.the.control.knob.to.the.bur-
ner.position.
-. Remove. the. downstream. pressure.
connection. screw. on. the. valve. (8)..
Move.the.water.column.gauge.to.the.
downstream. pressure. connection..
Tighten. the. inlet. pressure. connec-
tion.screw.
-.Set.the.required.temperature.on.the.
boiler.thermostat..When.the.burner.
is.fully.on,.calibrate.the.burner.gas.
pressure. (using. adjustment. screw.
2). referring. to. the. values. indicated.
in.the.technical.data.table.(point.1.3).
according.to.the.type.of.gas.used.
-.Seal.the.performed.adjustment.
-. If. the. burner. does. not. switch. on,.
check. that. sufficient. voltage. rea-
ches.the.gas.valve.
4.3
ADJUSTING THE GAS
PRESSURE TO BURNERS
Pressure. calibration. and. gas. input.
are.carried.out.by.the.manufacturer..
During.installation.of.the.equipment,.
feed.pressure.might.be.different.from.
standard.values..
It. is. therefore. necessary. to. check.
pressure.and.gas.input.when.igniting.
the.boiler.for.the.first.time..
This. test. should. be. performed. with.
the.boiler.in.full.operation.(obviously.
no. other. gas. appliances. should. be.
working.at.the.same.time)..Read.the.
gas. meter. twice. every. 6. minutes..
Multiply. the. consumption. by. ten. to.
calculate.the.consumption.per.hour..
If. this. value. does. not. correspond. to.
the.one.in.point.1.3,.turn.the.screw.of.
the. pressure. regulator. on. the. valve.
until. the. exact. value. is. obtained..
Screw. slowly. and. gradually.. Read.
the.gas.meter.at.least.thirty.seconds.
after.regulating.the.pressure.
4.4
GAS CONVERSION
(fig. 8)
A. kit. is. supplied. complete. with. the.
necessary.change-over.materials.for.
operation. with. butane. gas. (G30). or.
propane. gas. (G31).. Operate. in. the.
following. manner. for. changing. over.
from.one.gas.to.another:
–. Replace.the.main.nozzles.and.pilot.
nozzle.supplied.in.a.kit.
–. Fully. tighten. the. gas. valve.
adjustment.screw.(2.fig..7).
–. Set. valve. input. pressure. at. 30/37.
mbar. according. to. the. type. of. gas.
by. acting. on. the. outer. pressure.
reducer.
–. When. the. working. pressures. have.
been. adjusted,. reseal. the. regula-
tors.
–. After. have. ultimated. the. conver-
sion.of.the.boiler,.please.stick.onto.
the.casing.panel.the.plate.showing.
the. relevant. feeding. gas. which. is.
included.into.the.kit.
NOTE: After assembling all the gas
connections, a test for gas tightness
4 USE AND MAINTENANCE
Fig..7
KEY
. 1. Control.knob
. 2.. Burner.pressure.adjustment.screw
. 3.. Pilot.flow.rate.adjustment.screw
. 4.. Thermocouple.connection
. 7.. Power.pressure.connection
. 8.. Burner.pressure.connection
. 9.. Burner.solenoid.valve
Содержание RX 19 TP
Страница 1: ...Fran ais English Cod 6091836 02 2017...
Страница 2: ...1 2 3 4...
Страница 3: ...1 1 1 RX TP G30 G31 1 2 1 2 1 RX TP 19 26 1 R M G...
Страница 4: ...1 2 2 RX TP 37 48 55 1 a 1 R 1 M 3 4 G...
Страница 6: ...1 4 2 1 2 3 4 5 6 7 8 9 LED 10...
Страница 8: ...G20 2 0 G30 G31 2 2 1 2 3 A 500 20...
Страница 9: ...2 3 1 4 UNI 7129 92 35 2 4 RX TP 5 7 mVcc 250 300 mVcc...
Страница 10: ...2 4 1 5 TR TF TS TP T VP BP TA 1 2 5...
Страница 11: ...3 1 M12 2 3 4 M12 5...
Страница 12: ...3 1 6 8 2 RX TP 37 55 12 5 M12 3 2 SIT 820 SIT 820...
Страница 13: ...4 4 1 820 7 1 2 3 4 7 8 9 7 20 37 1 20 8 2 1 3...
Страница 14: ...4 3 6 1 3 4 4 8 1 2 3 4 5...
Страница 15: ...4 4 8 G30 G31 2 7 30 37 4 5 4 6 4 6 1 RX TP 19 26 RX TP RX TP 37 55...
Страница 16: ...4 6 2 4 6 3 4 6 4 700 800 300mV 4 6 5 5 7 4 6 6 4 7...
Страница 17: ...3 1...
Страница 18: ...1 9 1 2 3 A B C OFF...
Страница 19: ...A 2 B 10 1 2 3 4 1 45 85 2 60 OFF 9 OFF C...
Страница 20: ...9 3 95 10 3 GAZ...
Страница 47: ......