background image

MURELLE 110 BOX ErP

TRANSLATION OF THE ORIGINAL INSTRUCTIONS

BRAVA DGT HE

25 - 30 - 35

199838

INSTALLATION AND SERVICING INSTRUCTIONS

ENSURE THAT THESE 

INSTRUCTIONS ARE LEFT 

FOR THE USER AFTER 

COMPLETION OF THE 

BENCHMARK SECTION

PLEASE READ THE 

IMPORTANT NOTICE 

WITHIN THIS GUIDE 

REGARDING YOUR BOILER 

WARRANTY

EN

Cod. 6316191 - 08/2013

BRAVA DGT HE

25 - 30 - 35

199838

INSTALLATION AND SERVICING INSTRUCTIONS

ENSURE THAT THESE 

INSTRUCTIONS ARE LEFT 

FOR THE USER AFTER 

COMPLETION OF THE 

BENCHMARK SECTION

PLEASE READ THE 

IMPORTANT NOTICE 

WITHIN THIS GUIDE 

REGARDING YOUR BOILER 

WARRANTY

EN

Cod. 6316191 - 08/2013

please place a sticker

from the installation pack here

BOILER  DETAILS

USER, INSTALLATION AND SERVICING INSTRUCTIONS

  

6332393

 - 05/2022 - R0

199839

Содержание MURELLE 110 BOX ErP

Страница 1: ...GUIDE REGARDING YOUR BOILER WARRANTY EN Cod 6316191 08 2013 BRAVA DGT HE 25 30 35 199838 INSTALLATION AND SERVICING INSTRUCTIONS ENSURE THAT THESE INSTRUCTIONS ARE LEFT FOR THE USER AFTER COMPLETION O...

Страница 2: ...into its installation location Manoeuvring the boiler may include the use of a sack truck and involve lifting pushing and pulling Caution should be exercised during these operations Operatives should...

Страница 3: ...ulations 2016 426 EC Electromagnetic Compatibility Directive 2014 30 EU Low Voltage Directive 2014 35 EU Ecodesign Directive 2009 125 EC Regulation EU N 813 2013 811 2013 CONTENTS 1 DESCRIPTION OF THE...

Страница 4: ...nerators NOTE The appliance must be turned on for the first time by an authorised technician 1 DESCRIPTION OF THE APPLIANCE 1 2 OVERALL DIMENSIONS fig 1 361 177 780 397 91 265 253 265 253 377 2366 203...

Страница 5: ...392 Max operating temperature T max C 85 Flue gas temperature at Q Nominal 80 60 C C 64 Flue gas temperature at Q Minimum 80 60 C C 51 Flue gas temperature at Q Nominal 50 30 C C 45 Flue gas temperat...

Страница 6: ...M System delivery R System return G Gas S3 Condensate outlet M2 Hot water tank delivery R3 Hot water tank return 600 1000 4500 4000 3500 3000 2500 2000 1500 PORTATA l h PERDITE DI CARICO TRA GLI A TT...

Страница 7: ...cola Serial n 9999999999 PAR 1 68 G20 70 G31 PAR 2 9 MODEL SERIAL NUMBER YEAR OF CONSTRUCTION WATER CONTENT IN BOILER HEAT INPUT MAX HEAT OUTPUT MAX 80 60 C HEAT OUTPUT MAX 50 30 C MAX OPERATING PRESS...

Страница 8: ...bitor like Sentinel X100 or Fernox Protector F1 to protect it against corrosion and the formation of deposits It is important to check the concentration of the inhibitor after each modification to the...

Страница 9: ...outlet to the right of the modules You can move the outlet to the left by simply rotating the manifold through 180 390 125 180 MURELLE 110 92 5 BOX ErP con kit c ollettor e fumi cod 8102510 MURELLE EQ...

Страница 10: ...series cascade configuration The board installs to the back of the control panel and is supplied as an optional kit code 8092249 2 8 1 MODBUS mode This mode enables communications over a MODBUS netwo...

Страница 11: ...tact gap of at least 3 mm The omnipolar switch must enable com plete disconnection in overvoltage cat egory III Observe the L N polarity and the earth connection NOTE SIME declines all liability for d...

Страница 12: ...mperature sensor optional OP Mechanical timer optional AR Remote alarm VZ Zone valve AUX Auxiliary connection RS 485 CASCADE MODBUS board C1 Filter condensator if present NOTE Connect TA1 to terminals...

Страница 13: ...d Malfunction 5 TIMER optional Mechanical timer code 8092228 o digital timer code 8092229 for programming heating and DHW PC CONNECTION This should only be used with the SIME programming kit and only...

Страница 14: ...ualizzazione temperatura sonda fumi SF 8 Visualizzazione corrente di ionizzazione in A 17 Visualizzazione portata sanitaria flussimetro es 18 l min e 0 3 l min o stato flussostato rispettivamente ON e...

Страница 15: ...mando pompa PWM 36 Visualizzazione stato flussostato solare rispettivamente ON e OFF 60 Visualizzazione codice errore ultima anomalia 61 Visualizzazione codice errore penultima anomalia 70 Codice di w...

Страница 16: ...chimney 0 20 1 0 10 Connected device configuration 1 SIME HOME 1 2 CR 53 3 RVS 43 143 4 RVS 46 530 5 RVS 61 843 11 External sensor value correction 5 5 C 1 0 12 Backlighting time Always sec x 10 1 3...

Страница 17: ...Solar collector Tmin 30 0 C 1 10 48 Solar integration Tmax 80 199 C 1 120 PARAMETER RESET PAR DESCRIPTION RANGE UNIT STEP DEFAULT 49 Reset parameters to default 1 PAR 1 PAR 2 equal to If you have dif...

Страница 18: ...e gas sensors as a function of temperature If the heating delivery SM heating return SR and flue gas SF sensors are malfunctioning the boiler will not run 3 7 ELECTRONIC IGNITION Flame ignition and de...

Страница 19: ...heck the CO2 values with a gas tester Procedure 1 Hold the button 5 3 1 2 4 down for a few seconds 2 Hold the button 5 3 1 2 4 down for a few seconds to set the boiler to maximum power 3 Find the CO2...

Страница 20: ...ed again 4 5 2 Screed drying function fig 22 The screed drying function keeps the floor at a set temperature and is only enabled in systems with the MIX ZONE kit code 8092275 76 The temperature profil...

Страница 21: ...boiler turns off and the display shows fault ALL 03 HEATING DELIVERY SENSOR FAULT ALL 05 fig 23 4 When the heating delivery sensor SM is open or shorted the boiler turns off and the display shows faul...

Страница 22: ...d check the pump is working properly To quit the fault press the control button 5 3 1 2 4 2 If the fault recurs contact your Authorised Techni cal Service Centre SIPHON ANTI FREEZE SENSOR FAULT ALL 10...

Страница 23: ...rmal operation but the solar function is no longer available BOILER SOLAR SENSOR S2 FAULT ALL 25 fig 23 19 When the solar sensor is open or shorted the display shows fault ALL 25 The boil er continues...

Страница 24: ...are no communications between the boiler board and the RS 485 board in CASCADE mode the boiler shuts down and the display shows fault ALL 34 The boiler starts again when communica tions are restored o...

Страница 25: ...no what is the maximum central heating output selected kW Dynamic gas inlet pressure mbar C Central heating return temperature C System correctly balanced rebalanced Yes COMBINATION BOILERS ONLY Is t...

Страница 26: ...eer name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions and readings are correct yes Gas...

Страница 27: ...the calculated head loss tables on fig 6 7 and 8 Boiler 1 Boiler 2 Boiler 3 Boiler 4 Boiler 5 Boiler 6 Calculated head loss Set value of PAR 9 PAR 1 see sec on 2 2 2 When installed with a cascade flu...

Страница 28: ...a on pipework downstream of Isola ng valve using leak detec on fluid Y N Check ghtness of all valves Y N Carryout igni on test of boiler with gas isolated to ensure boiler fails safe Y N Turn on gas s...

Страница 29: ...29 5 EXPLODED VIEWS FOR SPARE PARTS...

Страница 30: ...30...

Страница 31: ...033 6120529 Nipple 1 1 4 x 1 1 2 034 6216245 C H flow pipe 035 2030256 Gasket diam 26x38x3 036 6040210 Pressure relief valve 3 4 5 ba A 037 6120502 Nipple 3 4 x3 4 OT 038 2030249 Gasket 24x17x3 039 61...

Страница 32: ...0 Pipe fitting 1 1 2 115 6120541 Pipe fitting 1 1 4 116 2030257 Gasket diam 30x22x3 117 6229502 Plug 1 F OT 118 6231331 D H W tank sensor B1 A 121 6177503 Ball cock 1 2 M x 1 2 F 130 5193306 Box 132 6...

Страница 33: ...m ID typically 22mm OD plastic pipe or as per manufacturer s instructions and this should fall a minimum of 45mm per metre away from the boiler taking the shortest practicable route to the termination...

Страница 34: ...ir break is required Key 1 Boiler 2 Visible air break 3 75 mm trap 4 Visible air break and trap not required if there is a trap with a minimum condensate seal of 75 mm incorporated into the boiler 5 S...

Страница 35: ...nimum condensate seal of 75 mm incorporated into the boiler In this case the 100 mm is measured to the trap in the boiler 5 Sink basin bath or shower 6 Open end of condensate discharge pipe direct int...

Страница 36: ...er level end cut at 45 Note the maximum external condensate discharge length is 3 metres 6 Minimum internal diameter 19 mm 7 Pipe size transition 8 Minimum internal diameter 30 mm 9 Water weather proo...

Страница 37: ...used External waste pipes from kitchens utility rooms or bathrooms such as sink basin and bath or shower waste outlets should be insulated with waterproof UV resistant class 0 material terminated bel...

Страница 38: ...4 5 75mm sink waste trap 2 5 4 3 Key 1 Boiler 2 Visible air break at plug hole 3 75 mm sink basin bath or shower waste trap 4 Sink basin bath or shower with 5 Open end of condensate discharge pipe di...

Страница 39: ...ons should be followed The condensate pipe should be run internally as far as possible before going externally and the pipe diameter should be increased to a minimum of 30mm ID typically 32mm OD befor...

Страница 40: ...of 75mm incorporated into the boiler 5 Soil and vent stack 6 Invert 7 450mm minimum upto three storeys 8 Minimum internal diameter 19 mm 9 Pipe size transition point 10 Minimum internal diameter 30mm...

Страница 41: ...ub zero temperatures i e 15 C for 48 hours BS6798 refers to devices that gas BS6798 section 6 3 8 note 4 The boiler manufacturer s instructions will disposal of the condensate Additional Measures meas...

Страница 42: ...wed Insulation Materials Insulation used for external condensate pipes sink or washing machine waste pipes should be of class O grade with an outer coating that is weather proof is recommended for 32m...

Страница 43: ...ate discharge pipe from boiler 2 Pipe size transition point 3 Water weather proof insulation 4 43mm 90 male female bend 5 External rain water pipe into foul water 6 External air break 7 Air gap 8 9 Mi...

Страница 44: ...14 or boiler installation manual for soakaway design requirements any above ground section of condensate discharge pipe should be run and insulated as described above Figure 7 following page shows a s...

Страница 45: ...incorporated into the boiler refer to manufacturers instructions 5 External length of pipe 3 m maximum 6 Open end of condensate discharge pipe direct into gully 25 mm min below grating but above water...

Страница 46: ...be run either above or below round level End cut at 45 3 Diameter 100 mm minimum plastic tube 4 Bottom of tube sealed 5 Limestone chippings 6 Two rows of three 12 mm holes at 25 mm centres 50 mm from...

Страница 47: ...int for heating cir cuit 2 Pressing it a third time selects the setpoint for heating circuit 3 on a three zone system The display should be as FOR THE USER TURNING ON AND OPERATION Apre 2 2 Fig 24 Apr...

Страница 48: ...the main switch and close the gas valve If very low temper atures are forecast it is best to drain the water circuits to prevent the pipes burst ing when the water freezes TROUBLESHOOTING When a malf...

Страница 49: ...connected by professionally qualified personnel DISPOSING OF THE APPLIANCE Boilers and electrical and electronic equipment used by professional users or classifiable as professional waste may not be...

Страница 50: ...EU No 811 2013 which supplements Directive 2010 30 EU 110 BOX ErP 105 201 90 Specific precautionary measures to be adopted at the time of assembly installation or maintenance of the equipment are con...

Страница 51: ...ara las calderas de condensaci n de 37 C para las calderas de baja temperatura y de 50 C para las dem s calderas a Regime de alta temperatura temperatura de retorno de 60 C entrada do aquecedor e temp...

Страница 52: ...Sime Ltd 1a Blue Ridge Park Thunderhead Ridge Glasshoughton Castleford WF10 4UA Phone 0345 901 1114 Fax 0345 901 1115 www sime co uk Email enquiries sime co uk...

Отзывы: