V: Voltage (AC120V, 230V), S/W1: Switch1, S/W2: Switch2, H1: Heater1, H2: Heater2,
EG: Earth Ground, R1: Resistor1, R2: Resistor2, L1: Lamp 1, L2: Lamp 2, BZ: Buzzer,
TS: Temperature Controller, TF: Temperature Fuse
3
Circuit Diagrams
S/W1
H1
R2
S/W2
TS
R1
BZ
L1
H2
L2
TF
V
EG
BZ
Installation and Operation
1. Assemble hanger
rod
• Pull out hanger rod 1
to the end and fix it by
rotating 1. Assemble
hanger rod 1 & 2, and
fix it by rotating the
round part.
5. Connect to power
supply
• Insert plug to power
socket and turn on the
switch.
6. Operate
• It is ready to use
when steam is sprayed
after 1 minute and 30
second.
4. Insert water tank
• Fill water tank with
water, close water tank
cap and place it to
steamer.
3. Hose set assemble
• SR~5000 Assemble
hose set and steamer
using accompanied
spanner.
SR~8000 Insert nipple of
hose to steamer,then
turn right .
• Be careful to tighten
the joint during
assemble.
2. Assemble hanger
rod and steamer
• Assemble hanger rod
set from item 1 with
steamer.
Silver Steamer