Technical Documentation
79
users manual inverter SE2.8i - SE3.8i - SE4i - SE5i
the energy stored in capacitors completely.
WARNING!
Must confirm that all DC and AC circuit breakers are turned off for at least five (5) minutes before opening the front covers of
the inverter and the wiring box and disconnect the DC and AC wires between them. The wires been disconnected must be wrapped
with an insulated material to prevent staff from the electrical shock.
WARNING!
After the inverter is removed from the mounting bracket, the through holes of the wires on top of the wiring box must be covered
with the cover plate that is attached on top of the wiring box to prevent the box from the water drops causing current leakages.
WARNING!
Not to keep any spare parts inside the wiring box.
Содержание se2.8i
Страница 1: ...nverters...
Страница 12: ...11 1 pc 1 pc...
Страница 18: ...on 17 OFF Fig 2 3 3 Remove the cover of the wiring box...
Страница 29: ...Fig 2 3 3 4 RS 485 connection Installation user s manual inverter SE2 8i SE3 8i SE4i SE5i...
Страница 54: ...53...
Страница 62: ...61 M SE 2 8i DS Fig 5 1 2 Outline Drawing of SE2 8i DS SE 3 8i DM Fig 5 1 4 Outline Drawing of SE3 8i DM...
Страница 64: ...63 E5i S...
Страница 72: ...71 4 2 1 1 Remove the cover of the Inverter 5 4 2 1 2 Remove the DC and AC wires...
Страница 74: ...73 5 4 2 1 5 Un hang the inverter carefully cate the cover plate in place and fasten the screws...
Страница 76: ...75 tall the cover plate and fix it on the top of the wiring box...
Страница 81: ...Notes user s manual inverter SE2 8i SE3 8i SE4i SE5i...
Страница 82: ......