background image

...............................................................................................................................................................................

© 2015-2016. Silicon Graphics International Corp. All rights reserved.

Provided portions may be copyright in third parties, as indicated elsewhere herein. No permission is granted to copy, 
distribute, or create derivative works from the content of this electronic documentation in any manner, in whole or in 
part, without the prior written permission of SGI.

Silicon Graphics, SGI, the SGI logo, NUMAlink, and UV are trademarks or registered trademarks of Silicon Graphics 
International Corp. in the United States and/or other countries worldwide.

SAP, SAP HANA, and other SAP products and services mentioned herein as well as their respective logos are 
trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries.

All other trademarks mentioned herein are the property of their respective owners.

[03.25.2016]

Document Revision History

001 - November 2015 - Original publication

002 - March 2016 - Added steps for running 

uv3dmp

 before and after part replacement

...............................................................................................................................................................................

Содержание UV 300H

Страница 1: ...ves are not accessible System does not boot Safety Precautions A fully loaded chassis weighs approximately 125 pounds Do not attempt to remove a chassis from the rack by yourself You do not need to completely remove the chassis from the rack to replace a BaseIO card Slide the chassis out the front of the rack until the safety locks engage at the halfway point to keep the chassis in place Then remo...

Страница 2: ... and other cables from the front of the chassis c Remove the power cables from the rear of the chassis BaseIO Card Replacement Procedure Removing a BaseIO Card 1 Grasp the handles and slide the chassis out the front of the rack until the chassis locks in place 2 Remove the T10 TORX screws that secure the front top cover to the chassis 3 Slide the cover toward the front of the chassis and lift off ...

Страница 3: ...front of the chassis 8 Replace the bezel 9 Reconnect the power cables on the rear of the chassis After BaseIO Card Replacement Complete the following steps to return the system to operational 1 Connect power to the system 2 Run the nl7cfg utility from the RMC to verify cabling rmc nl7cfg Recable and run the utility again if necessary 3 Have the customer boot the operating system 4 Modify the etc u...

Страница 4: ...lowing steps to configure the replacement BaseIO card 1 Configure eth0 with the proper static IP address 2 Configure BIOS assisted RAID For more information refer to Managing BIOS assisted RAID on an SGI UV 300H Server SGI publication number 007 6454 00x Note It is not necessary to flash any firmware on the BaseIO card ...

Страница 5: ...nk and UV are trademarks or registered trademarks of Silicon Graphics International Corp in the United States and or other countries worldwide SAP SAP HANA and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE or an SAP affiliate company in Germany and other countries All other trademarks mentioned herein are the pr...

Отзывы: