Silicon Graphics SG1 Скачать руководство пользователя страница 7

 
 
 

CAUTION!!

 

 Risk of electrical shock. DC voltage source is existed inside this   
 equipment.Each circuit must be individually installed. 

 CAUTION!! 

 Risk of electrical shock. Do not remove cover, no user serviceable parts  
  inside. Refer servicing to qualified service personnel. 

 APPLICATION INFORMATION:

 

 Provided with integral electronic protection against AC & DC overloads. 
 

 

 6-2: please follow these guideline to install the inverters :

 

 A . Unpack and inspect the inverter,check to see that the power switch in the   
 OFF  position. 
 B.  Connect the cables to the power input terminals of inverter. 
 The red terminal is positive (+) and black terminal is negative (-). Connect  
  the cables into the terminals and tighten the wing nut to the wires securely. 
 C. Connect the cable from the negative terminal of the inverter to the  
  negative terminal of the power source. Make a secure connection. 

 
 

CAUTION!!

 

 

Loosely tightened connectors result in excessive drop and may 

 

cause overheated wires and melted insulation. 

  

  D. Before proceed further, carefully check if the terminals connect correctly.

 

 
 

CAUTION!!

 

 

Reverse polarity connection will blow a fuse in inverter and may 

 

permanently damage the inverter.

 Damage caused by reverse 

 

polarity connection is not covered by our warranty.

 

  
 E. Connect the cable from the positive terminal of inverter to the positive terminal of    
 the power source. Make secure connection. 

 
 

WARNING!!

 

 

You may observe a spark when you make this connection since 

 

current may flow to charge capacitors in the power inverter. 

 

Do not make this connection in the presence of flammable fumes, 

 

explosions or fire may result. 

  
 
 

F. Insert the MC4 connector of solar panel to the port .Make sure that the   

 polarity of PV array is right connected . G.Set power inverter switch to the   
 ON position and turn the test load on, the inverter should supply power to  
  the load. 

12 

 

6-3. Inverter Operation

 

 To operate the power inverter, use the ON / OFF switch on the Front panel  
  to turn the power on. Then the power inverter is ready to deliver AC power  
  to your loads. If there is several loads use, turn them on separately after the  
  

inverter is “ON” in order to prevent OVP resulted from the surge power. 

   6-3-

1. Set the power switch to “ON” position .Then the inverter will make   

   self- 

diagnosis, and the LED’s indicators will turn to “Green” color, then the  

   inverter starts  to work successfully. 
   6-3-2. Set the power switch to the OFF position, then the inverter stops and 
   all the lights go Off. 

   CAUTION!!

 

   If the equipment is used in a manner not specified by the manufacturer, the   
   protection  provided by the equipment may be impaired! 
  

 

  6-4 .Battery Installation and Replacement : 

 

   6-4-1 :

 

Recommend battery

One piece 12V 100AH-130AH Lead-acid or  

   Gel battery with free maintenance.  
 

  

6-4-2.

 

When replacing batteries, replace with the same type and number of  

  batteries or battery packs with recommend. General instructions regarding  
  removal and installation of batteries;  

  

  CAUTION!!

 

  Do not dispose of batteries in a fire. The batteries may explode;  

  CAUTION!!

 

  Do not open or damage batteries. Released electrolyte is harmful to the skin and   
  eyes. It may be toxic; 

  CAUTION!!

 

  A battery can present a risk of electrical shock and high short-circuit current.  

 

 

6-4-3

:

The following precautions should be observed when working on  

   batteries:  
   A. Remove watches, rings, or other metal objects.  
   B. Use tools with insulated handles. 
   C. Wear rubber gloves and boots. 
   D. Do not lay tools or metal parts on top of batteries. 
   E. Disconnect charging source prior to connecting or disconnecting battery   
        terminals.  
   F. Determine if battery is inadvertently grounded. If inadvertently grounded,  
        remove source from ground. Contact with any part of a grounded  
        battery can result in electrical shock. The likelihood of such shock can  
        be reduced if such grounds are removed during installation and  
        maintenance (applicable to equipment 

and remote battery supplies not  

         having a grounded supply circuit). 
 

13 

Содержание SG1

Страница 1: ... Status LED 5 4 Electrical Performance 6 7 4 1 Specification SG1 6 4 2 Specification Solar Charger Controller 7 5 Introduction 8 10 5 1 Solar Generator SG1 8 5 2 Front view and side view 8 9 5 3 LED Indicator Display function 10 6 Installation and Warning 11 13 6 1 Installation 11 12 6 2 Follow these guideline 12 6 3 Inverter Operation 13 6 4 Battery Installation and Replacement 13 7 Symbols Expla...

Страница 2: ...onal metal items such as rings bracelets necklaces and watches when operating with a lead acid batteries Doing so may cause short circuit and very high temperature which can melt metal items and even burn you 2 2 Features Modified sine wave output Output frequency50 Hz Input output fully reinforce isolated design High efficiency 75 Driving highly reactive capacitive loads at start moment Color ind...

Страница 3: ...rsed polarity is not covered by the warranty 4 WARNING Operation of the inverter without a proper ground connection may result in an electrical safety hazard 3 2 Panel operation Front view A ON OFF switch Leave in the OFF position during installation B Over heat protection LED sparkles when product temperature gets high it would shut down automatically while temperature arrives 55 C 5 C C Overload...

Страница 4: ...d short circuit protection 1 25 rated load current 60sec 1 5 rated loads current 5sec over load protection action 3 Rated load current short circuit protection action Self consumption current 6mA Charge circuit voltage drop 0 26V Load circuit voltage drop 0 15V Over voltage protection 17V 12V 34V 24V Work temperature Industry stage 35 C to 55 C Commercial stage 5 C to 50 C Boost charge voltage 14 ...

Страница 5: ... design bulk absorption float Wide volt range operation 90 135V 180 265V Durable and corrosion resistant construction 9 Transformer isolated for safety Bypass function Emergency backup light LED function 20A PWM Solar charger controller function option Max 100Ah battery space USB port 5V 2A 5 2 Front view and side view 8 10 11 DO NOT use this 2nd DC terminal alone Please connect the main battery c...

Страница 6: ...e recommended wire lengths and sizes 8AWG Do not mount the Inverter where it will be exposed to the gases produced by the battery These gases are very corrosive and prolonged exposure will damage the Inverter WARNING Shock Hazard Before proceeding further carefully check that the Inverter is NOT connected to any batteries and that all wiring is disconnected from any electrical sources Do not conne...

Страница 7: ... Operation To operate the power inverter use the ON OFF switch on the Front panel to turn the power on Then the power inverter is ready to deliver AC power to your loads If there is several loads use turn them on separately after the inverter is ON in order to prevent OVP resulted from the surge power 6 3 1 Set the power switch to ON position Then the inverter will make self diagnosis and the LED ...

Страница 8: ...d electronic equipment and batteries should be recycled at a facility capable of handing these items and their waste byproducts Contact your local authority for details in locating a recycle facility nearest to you Proper recycling and waste disposal will help conserve resources whilst preventing detrimental effects on your health and the environment 7 2 Recommend Accessories 7 2 1 PV Solar panel ...

Отзывы: