
20
007-4653-001
1: Operation Procedures
7. After you have selected the destination of the bricks you want to power on, select
Power UP
on the home window, and the power up confirmation window, shown in
Figure 1-13, appears. This window indicates which bricks will receive the
Power UP
command. In this example, the window indicates that all slots (bricks) in all racks (
r
* s*
) will be powered on. If you select
OK,
the power-up operation is confirmed, and
the home window appears. Selecting
Cancel
stops the power-on operation, and the
home window appears.
Figure 1-13
Power Up Confirmation Window
Power: OFF
L2-001 S/N Lxxxxxxx [firestorm]
SGI L2 Controller, Firmware xx.xx.x
Press the "OK" button to issue the
"r * s * power up" command.
OK
Cancel
Содержание Origin 3900
Страница 1: ...SGI Origin 3900 Server User s Guide 007 4653 001 ...
Страница 3: ...007 4653 001 iii Record of Revision Version Description 001 October 2003 Original Release ...
Страница 4: ......
Страница 12: ......
Страница 18: ......
Страница 62: ......
Страница 65: ...Product Description 007 4653 001 39 Figure 2 1 512 processor Origin 3900 Server ...
Страница 76: ......
Страница 104: ......
Страница 120: ......
Страница 172: ......
Страница 198: ......
Страница 208: ......
Страница 254: ......
Страница 274: ......
Страница 292: ......