![Silicon Graphics InfiniteStorage NEXIS 2000 Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/silicon-graphics/infinitestorage-nexis-2000/infinitestorage-nexis-2000_quick-start-manual_1271679021.webp)
Rack Mounting Instructions
007-4988-001
17
Figure 1-15
Reversing the Rail Pin Adapter
Preparing the Rack and Data Manager
The following procedures and figures explain how to install the data manager support rails into an
industry-standard rack:
1.
Make sure that the rack is in the final (operating) location and that it meets the following
clearance requirements:
–
76-cm (30 in) clearance in front of the cabinet
–
61-cm (24 in) clearance behind the cabinet
2.
Lower the stabilization feet on the rack so it does not move. Use any anti-tip extensions or
other stabilization hardware available with the rack.
Содержание InfiniteStorage NEXIS 2000
Страница 1: ...SGI InfiniteStorage NEXIS 2000 Quick Start Guide 007 4988 001 ...
Страница 4: ......
Страница 32: ......