18
007-6419-003
3: Server Installation
6. Press the button where the two outer rails are joined to retract the smaller outer rail.
7. Hang the hooks of the rails onto the rack holes and if desired, use screws to secure the front
of the outer rail onto the rack.
8. Repeat steps 5-7 for the remaining outer rail.
Install the Inner Rails
The inner rails are different for the left side and right side of the chassis and are so labeled.
Perform the following steps to install an inner rail as illustrated in
1. Place the inner rail on the appropriate side of the chassis.
Align the hooks of the chassis with the rail holes. Make sure the rail faces outward.
2. To secure the rail to the chassis, slide the rail toward the front of the chassis until the
quick-release bracket snaps into place.
3. Optionally, secure the rail to the chassis with screws as illustrated.
4. Repeat the prior steps for the other inner rail.
Содержание SGI UV 30
Страница 1: ...SGI UV 30 System User Guide 007 6419 003 ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 35: ...Install the System into a Rack 007 6419 003 19 Figure 3 2 Installing the Inner Rails ...
Страница 39: ...Check the Serverboard Setup 007 6419 003 23 Figure 3 4 Accessing the Inside of the Chassis ...
Страница 51: ...Replacing a Power Supply 007 6419 003 35 Figure 5 3 Replacing a Power Supply ...
Страница 53: ...Replacing Disk Drives 007 6419 003 37 Figure 5 4 Removing HDD Carrier from Chassis ...
Страница 54: ...38 007 6419 003 5 Chassis Maintenance Figure 5 5 Removing Dummy Drive from Carrier ...
Страница 57: ...Replacing System Fans 007 6419 003 41 Figure 5 7 System Fans ...
Страница 58: ......
Страница 66: ......
Страница 68: ......