![SIKA VTY10K5 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/sika/vty10k5/vty10k5_operating-manual_1270417021.webp)
VTY
Maintenance, Flushing and Return Shipment
Technical changes reserved
- 21 -
Flushing
Remove the flow sensor from the pipe section.
Only flush the flow sensor in flow direction with water.
Observe the maximum flow of the sensor.
IMPORTANT
The bearings of the flow sensor can be dam-
aged when blowing out.
Never blow out the flow sensor with com-
pressed air.
Return shipment
Please observe the instructions for the return procedure on our website
www.sika.net/en/service/service/rma-return-of-products
Содержание VTY10K5
Страница 13: ...VTY Technische Daten Technische nderungen vorbehalten 13 VTY25 Gewinde Alternative f r elektrischen Anschluss...
Страница 25: ...VTY Technical Data Technical changes reserved 25 VTY25 Thread Alternative for electrical connection...
Страница 26: ...VTY 26 SIKA Ea7900_VTY 05 2022...
Страница 27: ...VTY Technical changes reserved 27...