![Signal POWER STATION 4 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/signal/power-station-4/power-station-4_operating-manual_1268211008.webp)
Series 4 Operating Manual - Nebula
Issue 1.00
www.signal-group.com
P a g e
| 8
of 26
2.4
Competent Personnel
Specialist knowledge of this instrumentation is a necessity for working with and on the unit.
Authorised personnel for installing, operating, servicing, and maintaining the analyser are
instructed and trained personnel of the operating company, Signal Group Ltd or their local
representatives.
‒
It is the responsibility of the operating company to:
‒
Ensure their staff have adequate training.
‒
Observe safety regulations.
‒
Follow this instruction manual.
‒
Operators must:
‒
Have been properly trained.
‒
Have read and understood all relevant sections of the instruction manual before
commencing use of the instrument.
‒
Know all the applicable safety mechanisms and regulations.
To avoid personal injury and loss of property, do not install, operate, maintain or service this
instrument before reading and understanding this manual and receiving appropriate training.
Do not dispose of this instruction manual.