4116298
Rev 7.0
November 07, 2016
44
Product Technical Specification and
User Guide
Reliability Compliance and
Recommendations
7.2.6.
Handling Resistance Stress Tests
The following tests the modem
’s resistance to handling malfunctions and damage.
Table 29.
Handling Resistance Stress Tests
Designation
Condition
ESD Test
Standard: IEC 61000-4-2
Special conditions:
Contact discharges: 10 positive and 10 negative applied (Voltage:
±2kV, ±4kV, ±6kV)
Air discharges: 10 positive and 10 negative applied (Voltage: ±2kV,
±4kV, ±8kV)
Operating conditions: Powered
Duration: 72 hours
Free Fall Test
FFT
Standard : IEC 60068-2-32, Test Ed
Special conditions:
Drop: 2 samples for each direction
Equivalent drop height: 1m
Number of directions: 6 (±X, ±Y, ±Z)
Number of drops/face: 2
Operating conditions: Un-powered
Duration: 24 hours
Содержание AirLink GL8200
Страница 61: ......