Wire and commission
Trim the wires leaving a minimum of 300mm/12 inches
exposed.
Single-phase wires thread through the small, black ferrite (1)
only.
Three-phase brown, orange, yellow, and green/yellow ground
wiring thread firstly through the large grey ferrite (2).
Three-phase brown, orange, yellow only thread through the
large black ferrite (3).
Bend the wires to the side of the ferrite rings and up into the
connection points.
Check that the wiring is sitting behind the lower face of the
switch gear so they will not interfere with the service cover.
Tightening Torque:
Breaker 4.0 Nm/35 lb-in
Check the breaker terminals are tightened to the above
settings.
VersiCharge Ultra 50™ |
Installation Manual
24