Installation and Configuration Guidance
IP ROUTERS INSTALLATION GUIDE 3G OTU
667/CI/45025/000 Rev 4 Unrestricted
13
Safety of
Cable Handling
Use some PIB Self Amalgamating Tape (992/4/07906/000) (supplied) and some electrical tape
to protect the N-Type connectors.
3.3.1.
Installation of Pole Mounted Antenna Kit
The pole mounted 3G/4G Omni Antenna kit (667/1/46190/100) comes with:
•
3G/4G Omni Antenna
•
Bracket and fittings to mount the Antenna at the pole top
•
Installation drawing (667/CI/46190/ETC)
The reader is to refer to Installation drawing (667/CI/46190/ETC) for
details;
1
Install the antenna in the supplied plastic bracket.
2
Attach the plastic bracket to the metal Pole mounting bracket using
the supplied bolts.
3
Bolt the pole spacer kit to the pole using U Bolt provided.
4
Attach the Pole mounting bracket to the spacer kit and pull the an-
tenna cable out through the hole.
5
Plug terminated antenna cable directly into the Antenna
6
The N-Type connector needs to be protected using self-
amalgamating tape sealing against the bottom of the antenna hous-
ing and extending 1-2cm past the barrel of the connector onto the
cable.
7
Complete the protection by neatly covering the self-amalgamating
tape with black electrical tape, ensuring that the tape finishes with a
cut off end (do not snap tape).
8
At the cabinet, bring the cable into the cabinet and terminate using appropriate connect-
or, dependent on the router provided.
Safety of
Cable Handling
Use some PIB Self Amalgamating Tape (992/4/07906/000) (supplied) and some electrical tape
to protect the N-Type connectors.