5
SIVACON S4 - ALPHA
Design, construction and testing represent the main implementation phases.
Other phases are commissioning and maintenance, which take account of switchboard
design.
For instance, a rational layout of equipment simplifies accessibility and facilitates
input/output connections of cables and bars. Design and maintenance require
a rational layout.
SIEMENS declines any responsibilities for unconformable use and inadequate
or insufficient maintenance with the recommendation included.
Introduction
ENG