9 Commissioning the demo project
Integration of a SITOP 24V power supply in PCS 7
Entry ID: 10948108, V3.2, 01/2019
82
S
iem
e
n
s A
G
2
0
1
9
A
ll r
igh
ts
re
se
rv
e
d
9
Commissioning the demo project
You need the hardware to test the functionality of the SITOP UPS1600 and the
PSU8600. Testing with PLCSIM is not possible. You can, however, load the AS
program in PLCSIM and it is possible to set the signals of the redundancy and
selectivity modules or display them.
Figure 9-1
9.1
Installation
Before opening the project, install the Generic Station Description (GSD) of the
UPS1600 and of the PSU8600 on your engineering system.
The GSD and a corresponding installation manual for the SITOP UPS1600 can be
found in the entry "GSD for SITOP UPS1600 for integration in STEP 7 V5" in the
following link:
https://support.industry.siemens.com/cs/ww/en/view/75854605
The GSD and a corresponding installation manual for the SITOP PSU8600 can be
found in the entry "GSD for SITOP PSU8600 for integration in STEP 7 V5.5" in the
following link:
https://support.industry.siemens.com/cs/ww/en/view/102254061
Retrieving a project
If you have not already done so, download the project archive from the article page
of this application example. Carry out the following steps:
1. Start SIMATIC Manager.
2. Execute the menu command "File> Dearchive ..." and select the downloaded
project archive.
3. Open the de-archived project.