SIPART DR19
C73000-M7474-C34-4
25
1
How to use this assembly and installation
guide
For the best results, follow the instructions as laid down in this
manual.
The assembly and installation guide will enable you to carry out all
the necessary preparatory work prior to final starting-up of the
SIPART DR19 controller.
The tasks involved are:
D
Setting up the basic controller unit
D
Installation of the signal converter modules (optional)
D
Installation of the controller in a panel
D
Connection of the process signal lines to the basic unit
D
Connection of the process signal lines to the signal converter
modules
D
Connection of the power supply
You will find a description of the activities required for operating and
configuring the controller in the basic instruction manual
C73000-B7474-C140. More detailed information is contained in the
manual, which is available from your local Siemens offices under
the following order numbers.
English
C73000-B7476-C142
German
C73000-B7400-C142
Working
sequence
Preparations
Operation
and
configuration
Содержание SIPART DR19
Страница 4: ...ii ...
Страница 6: ...SIPART DR19 C73000 M7474 C34 4 2 ...
Страница 26: ...SIPART DR19 C73000 M7474 C34 4 22 ...
Страница 28: ...SIPART DR19 C73000 M7474 C34 4 24 ...
Страница 48: ...SIPART DR19 C73000 M7474 C34 4 44 ...
Страница 49: ......